ISO/ASTM 52911-3:2023 PDF

ISO/ASTM 52911-3:2023 PDF

Name:
ISO/ASTM 52911-3:2023 PDF

Published Date:
02/01/2023

Status:
Active

Description:

Additive manufacturing - Design - Part 3: PBF-EB of metallic materials

Publisher:
International Organization for Standardization/ASTM International

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$49.8
Need Help?

This document specifies the features of electron beam powder bed fusion of metals (PBF-EB/M) and provides detailed design recommendations.

Some of the fundamental principles are also applicable to other additive manufacturing (AM) processes, provided that due consideration is given to process-specific features.

This document also provides a state of the art review of design guidelines associated with the use of powder bed fusion (PBF) by bringing together relevant knowledge about this process and by extending the scope of ISO/ASTM 52910.


File Size : 1 file , 3.7 MB
Published : 02/01/2023
Same As : ISO/ASTM 52911-3:2023

History


Related products

ISO/ASTM 52900:2021
Published Date: 11/01/2021
Additive manufacturing - General principles - Fundamentals and vocabulary
$16.2
ISO/ASTM 52931:2023
Published Date: 01/01/2023
Additive manufacturing of metals - Environment, health and safety - General principles for use of metallic materials
$58.2

Best-Selling Products

NEBB BET PUBLICATION
Published Date: 08/01/2019
PROCEDURAL STANDARD FOR BUILDING ENCLOSURE TESTING
$0.3
NEBB BET PUBLICATION
Published Date: 08/01/2019
PROCEDURAL STANDARD FOR BUILDING ENCLOSURE TESTING
$62.1
NEBB BET PUBLICATION
Published Date: 03/01/2015
PROCEDURAL STANDARD FOR BUILDING ENCLOSURE TESTING
$62.1
NEBB BET PUBLICATION
Published Date: 03/01/2015
PROCEDURAL STANDARD FOR BUILDING ENCLOSURE TESTING
$123.9
NEBB BUILDING SYSTEMS
Published Date:
Procedural Standards for Whole Building Systems Commissioning of New Construction
NEBB BUILDING SYSTEMS
Published Date: 01/01/2019
PROCEDURAL STANDARDS FOR WHOLE BUILDING SYSTEMS COMMISSIONING OF NEW CONSTRUCTION
$62.1