Description:

Gas turbines - Acceptance tests

Publisher:
International Organization for Standardization

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$83.4
Need Help?

This International Standard applies to open-cycle gas-turbine power plants using combustion systems supplied with gaseous and/or liquid fuels as well as closed-cycle and semi-closed-cycle gas-turbine power plants. It can also be applied to gas turbines in combined cycle power plants or in connection with other heat-recovery systems.

In cases of gas turbines using free-piston gas generators or special heat sources (for example synthetic gas of chemical processes, blast furnace gas), this International Standard can be used as a basis but suitable modifications are necessary.

Acceptance tests of gas turbines with emission control and/or power augmentation devices that are based on fluid injection and/or inlet air treatment are also covered by this International Standard and it is necessary that they be considered in the test procedure, provided that such systems are included in the contractual scope of the supply subject to testing.

This International Standard does not apply to emission testing, noise testing, vibration testing, performance of specific components of the gas turbine, performance of power augmentation devices and auxiliary systems, such as air inlet cooling devices, fuel gas compressors, etc., conduct test work aiming at development and research, adequacy of essential protective devices, performance of the governing system and protective systems, and operating characteristics (starting characteristics, reliability testing, etc.).


File Size : 1 file , 1.5 MB
Note : This product is unavailable in Ukraine, Russia, Belarus
Published : 12/15/2009
Same As : ISO 2314:2009

History

ISO 2314:2009
Published Date: 12/15/2009
Gas turbines - Acceptance tests
$83.4
ISO 2314:1989
Published Date: 05/01/1989
Gas turbines - Acceptance tests
$29.4

Related products

ISO 20816-4:2018
Published Date: 06/01/2018
Mechanical vibration - Measurement and evaluation of machine vibration - Part 4: Gas turbines in excess of 3 MW, with fluid-film bearings
$49.8
ISO 3977-5:2001
Published Date: 12/15/2001
Gas turbines - Procurement - Part 5: Applications for petroleum and natural gas industries
$13.5
ISO 20816-2:2017
Published Date: 07/01/2017
Mechanical vibration - Measurement and evaluation of machine vibration - Part 2: Land-based gas turbines, steam turbines and generators in excess of 40 MW, with fluid-film bearings and rated speeds of 1 500 r/min, 1 800 r/min, 3 000 r/min and 3 600 r/min
$49.8
ISO 26382:2010
Published Date: 02/15/2010
Cogeneration systems - Technical declarations for planning, evaluation and procurement
$58.2

Best-Selling Products

BICSI 001-2017 R22
Published Date: 01/01/2017
Information and Communication Technology Systems Design and Implementation Best Practices for Educational Institutions and Facilities
$28.5
BICSI 002-2019
Published Date: 05/01/2019
Data Center Design and Implementation Best Practices
$157.5
BICSI 002-2024
Published Date: 05/01/2024
Data Center Design and Implementation Best Practices
$157.5
BICSI 003-2024
Published Date: 02/29/2024
Building Information Modeling (BIM) Practices for Information Communication Technology Systems
$31.5
BICSI 004-2018
Published Date: 03/01/2018
Information Technology Systems Design and Implementation Best Practices for Healthcare Institutions and Facilities
$64.5
BICSI 006-2020
Published Date: 11/25/2019
Distributed Antenna System (DAS) Design and Implementation Best Practices
$67.5