MIL MIL-C-22249/40B PDF

MIL MIL-C-22249/40B PDF

Name:
MIL MIL-C-22249/40B PDF

Published Date:
09/29/1989

Status:
Active

Description:

CONNECTOR SETS, PLUG ASSEMBLY, 6-PIN, COMPARTMENT SIDE (SUPERSEDING MIL-C-22249/40A)

Publisher:
Military Specifications and Standards

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?

File Size : 1 file , 79 KB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 3
Published : 09/29/1989

History


Related products

MIL MIL-DTL-55302/138C
Published Date: 03/24/2004
CONNECTORS, PRINTED CIRCUIT SUBASSEMBLY AND ACCESSORIES: PLUG, PIN, 160 CONTACT POSITIONS, FOR PRINTED WIRING BOARDS (.100 SPACING) (SUPERSEDING MIL-C-55302/138B)
$7.2
MIL MIL-DTL-83734/18
Published Date: 04/07/2000
SOCKETS, PLUG-IN ELECTRONIC COMPONENTS, LOW PROFILE, (FOR 6 PIN DUAL-IN-PACKAGES)
$7.2
MIL MIL-R-2726/44A
Published Date: 07/03/1986
RECEPTACLE, PORTABLE TRIPLE OUTLET, ELECTRICAL, 60-AMPERE, 500-VOLT, 3-PHASE GROUNDED (SYMBOL NO. 765.3) (SUPERSEDING MIL-R-2726/44)(S/S BY MIL-DTL-2726/44B)
$7.2

Best-Selling Products

JEDEC EIA 318-B
Published Date: 07/01/1996
MEASUREMENT OF REVERSE RECOVERY TIME FOR SEMICONDUCTOR SIGNAL DIODES
$17.7
JEDEC EIA 323 (R2002)
Published Date: 03/01/1966
AIR-CONVECTION-COOLED, LIFE TEST ENVIRONMENT FOR LEAD-MOUNTED SEMICONDUCTOR DEVICES
$15.3
JEDEC EIA 365 (R1984)
Published Date: 11/01/1969
PERFORMANCE TEST PROCEDURE FOR SOLAR CELLS AND CALIBRATION PROCEDURE FOR SOLAR CELL STANDARDS FOR SPACE VEHICLE SERVICE
$17.7
JEDEC EIA 397-1
Published Date: 07/01/1980
ADDENDUM No. 1 TO EIA-397
$31.8
JEDEC EIA 397
Published Date: 06/01/1972
RECOMMENDED STANDARD FOR THYRISTORS
$68.4
JEDEC EIA 557B
Published Date: 02/01/2006
STATISTICAL PROCESS CONTROL SYSTEMS
$22.2