MIL MIL-C-55116/11A PDF

MIL MIL-C-55116/11A PDF

Name:
MIL MIL-C-55116/11A PDF

Published Date:
05/02/1990

Status:
Active

Description:

CONNECTOR, RECEPTACLE, FIVE PIN AUDIO, CRIMP SLEEVE SPRING TERMINALS, WIRE STRAIN RELIEF, U-328 TYPE (SUPERSEDING MIL-C-55116/11) (S/S BY MIL-DTL-55116/11B)

Publisher:
Military Specifications and Standards

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?

File Size : 1 file , 83 KB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 2
Published : 05/02/1990

History


Related products

MIL MIL-C-28731/5F
Published Date: 07/21/1988
CONNECTOR, ELECTRICAL, INSERT (INSULATOR), MALE RECTANGULAR, POLARIZED, CENTER SCREW LOCK, FOR 130 REMOVABLE CONTACTS (SUPERSEDING MIL-C-28731/5E) (NO S/S DOCUMENT)
$7.2
MIL MIL-C-55302/50 Notice 1 - Cancellation
Published Date: 09/07/1979
CONNECTORS, PRINTED CIRCUIT SUBASSEMBLY AND ACCESSORIES: KEY, POLARIZING, CONNECTORS, ELECTRICAL, PRINTED WIRING BOARDS (NO S/S DOCUMENT)
$7.2
MIL MIL-C-55302/63F
Published Date: 04/08/1993
CONNECTORS,PRINTED CIRCUIT SUBASSEMBLY& ACCESSORIES,PLUG,PIN CONTACTS,DECADE INCREMENTS 10-70 CONTACT POSITIONS&INTERMEDIATE POSITIONS OF 14,24,44,54,26,36,56,66 FOR PRINTED WIRING BOARDS (.100 IN SPACING) (SUPERSEDING MIL-C-55302/63E) (S/S BY MIL-DTL-55302/63G)
$7.2
MIL MIL-C-85049/90
Published Date: 08/18/1992
CONNECTOR ACCESSORIES, ELECTRICAL, BACKSHELL, 90 DEG., SELF-LOCKING, SHIELD BAND TERMINATION, (RFI/EMI), SHRINK SLEEVE ACCOMMODATION, MIL-C-38999 SERIES III AND IV CONNECTORS) (S/S BY SAE-AS85049/90)
$7.2

Best-Selling Products

NEBB BET PUBLICATION
Published Date: 08/01/2019
PROCEDURAL STANDARD FOR BUILDING ENCLOSURE TESTING
$0.3
NEBB BET PUBLICATION
Published Date: 08/01/2019
PROCEDURAL STANDARD FOR BUILDING ENCLOSURE TESTING
$62.1
NEBB BET PUBLICATION
Published Date: 03/01/2015
PROCEDURAL STANDARD FOR BUILDING ENCLOSURE TESTING
$62.1
NEBB BET PUBLICATION
Published Date: 03/01/2015
PROCEDURAL STANDARD FOR BUILDING ENCLOSURE TESTING
$123.9
NEBB BUILDING SYSTEMS
Published Date:
Procedural Standards for Whole Building Systems Commissioning of New Construction
NEBB BUILDING SYSTEMS
Published Date: 01/01/2019
PROCEDURAL STANDARDS FOR WHOLE BUILDING SYSTEMS COMMISSIONING OF NEW CONSTRUCTION
$62.1