MIL MIL-P-52200B PDF

MIL MIL-P-52200B PDF

Name:
MIL MIL-P-52200B PDF

Published Date:
01/07/1972

Status:
Active

Description:

PONTON BOAT: HALF-SECTION, ALUMINUM HULL, SPOON BOW (S/S BY MIL-P-52200C)

Publisher:
Military Specifications and Standards

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?

File Size : 1 file , 1 MB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 11
Published : 01/07/1972

History

MIL MIL-P-52200C
Published Date: 09/08/1992
PONTON BOAT: HALF-SECTION, ALUMINUM HULL, SPOON BOW (NO S/S DOCUMENT) (SUPERSEDING MIL-P-52200B)
$7.2
MIL MIL-P-52200B
Published Date: 01/07/1972
PONTON BOAT: HALF-SECTION, ALUMINUM HULL, SPOON BOW (S/S BY MIL-P-52200C)
$7.2

Related products

MIL MIL-C-46793C
Published Date: 04/24/1992
CUPOLA BODY ASSEMBLY FOR ARMORED VEHICLE BRIDGE LAUNCHER, M60A1 AND M48A5 TANK CHASSIS (SUPERSEDING MIL-C-46793B)
$7.2
MIL MIL-A-52100C
Published Date: 10/07/1992
ADAPTERS: FOR BRIDGE, FLOATING, ALUMINUM, HIGHWAY-TYPE, DECK-BALK SUPERSTRUCTURE ON PNEUMATIC FLOATS (NO S/S DOCUMENT) (SUPERSEDING MIL-A-52100B)
$7.2
MIL MIL-B-52088F
Published Date: 04/03/1992
BRIDGE, ARMORED-VEHICLE-LAUNCHED, SCISSORING-TYPE: CLASS 60, ALUMINUM, 60-FOOT SPAN (SUPERSEDING MIL-B-52088E)
$8.7
MIL MIL-B-52097B
Published Date: 10/02/1992
BARS, CARRYING: MULTIPLE AND SINGLE, M4 BALK (NO S/S DOCUMENT) (SUPERSEDING MIL-B-52097A)
$7.2

Best-Selling Products

2000 National Construction Estimator
Published Date: 01/01/2000
Basic Plumbing with Illustrations
Published Date: 06/01/1994
Excavation & Grading Handbook
Published Date: 12/01/1987
Pipe & Excavation Contracting
Published Date: 10/01/1987