MIL MIL-PRF-123/5D PDF

MIL MIL-PRF-123/5D PDF

Name:
MIL MIL-PRF-123/5D PDF

Published Date:
04/21/2014

Status:
Active

Description:

Capacitors, Fixed, Ceramic Dielectric, (Temperature Stable and General Purpose), High Reliability, Leaded, Style CKS12

Publisher:
Military Specifications and Standards

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$3.6
Need Help?

File Size : 1 file , 120 KB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 3
Published : 04/21/2014

History

MIL MIL-PRF-123/5E
Published Date: 06/30/2019
Capacitors, Fixed, Ceramic Dielectric, (Temperature Stable and General Purpose), High Reliability, Leaded, Style CKS12
$3.6
MIL MIL-PRF-123/5D
Published Date: 04/21/2014
Capacitors, Fixed, Ceramic Dielectric, (Temperature Stable and General Purpose), High Reliability, Leaded, Style CKS12
$3.6
MIL MIL-PRF-123/5C
Published Date: 09/28/2007
Capacitors, Fixed, Ceramic Dielectric, (Temperature Stable and General Purpose), High Reliability, Leaded, Style CKS12
$7.2
MIL MIL-PRF-123/5B
Published Date: 06/18/2001
CAPACITORS, FIXED, CERAMIC DIELECTRIC, (TEMPERTURE STABLE AND GENERAL PURPOSE), HIGH RELIABILITY, LEADED, STYLE CKS12 (SUPERSEDING MIL-PRF-123/5A)
$7.2
MIL MIL-PRF-123/5A
Published Date: 09/28/1994
CAPACITORS, FIXED, CERAMIC DIELECTRIC, (TEMPERATURE STABLE AND GENERAL PURPOSE), HIGH RELIABILITY, LEADED, STYLE CKS12 (ADMINISTRATIVELY CHANGED FROM MIL-C TO MIL-PRF) (SUPERSEDING MIL-C-123/5) (S/S BY MIL-PRF-123/5B)
$7.2

Related products

MIL MIL-G-16408B
Published Date: 08/27/1953
GAGE, LIQUID LEVEL, TAPE AND FLOAT, DIRECT READING (FOR SHIPBOAD USE) (NO S/S DOCUMENT) (SUPERSEDING MIL-G-16408A)
$7.2
MIL MIL-DTL-24643/65A
Published Date: 01/28/2010
Cable, Electrical, Type LS3C179DT (Including Variation LS6C179DT)
$3.6
MIL MIL-DTL-70436A Notice 1 - Validation
Published Date: 09/30/2016
Detonator Assembly for Fuze, Point Detonating - M759
$3.6

Best-Selling Products

NBBI NB23-2007 Part 1
Published Date: 12/31/2007
National Board Inspection Code - NBIC, 2007 Edition - Part 1 - Installation
NBBI NB23-2007 Part 3
Published Date: 12/31/2007
National Board Inspection Code - NBIC, 2007 Edition - Part 3 - Repairs and Alterations
NBBI NB23-2007
Published Date: 12/31/2007
National Board Inspection Code - NBIC, 2007 Edition (Three Volumes)
NBBI NB23-2011 Part 2
Published Date: 2011
National Board Inspection Code - NBIC, 2011 Edition - Part 2 - Inspection
NBBI NB23-2011 Part 3
Published Date: 2011
National Board Inspection Code - NBIC, 2011 Edition - Part 3 - Repairs and Alterations
NBBI NB23-2011
Published Date: 2011
National Board Inspection Code - NBIC, 2011 Edition (Three Volumes)