MIL MIL-PRF-55310/8G PDF

MIL MIL-PRF-55310/8G PDF

Name:
MIL MIL-PRF-55310/8G PDF

Published Date:
07/08/2002

Status:
Active

Description:

OSCILLATOR, CRYSTAL CONTROLLED, TYPE 1 (CRYSTAL OSCILLATOR (XO)), 50 HZ THROUGH 50 MHZ, HERMETIC SEAL, SQUARE WAVE, TTL (SUPERSEDING MIL-PRF-55310/8F) (S/S BY MIL-PRF-55310/8H)

Publisher:
Military Specifications and Standards

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?

File Size : 1 file , 210 KB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 4
Published : 07/08/2002

History

MIL MIL-PRF-55310/8J
Published Date: 06/11/2009
Oscillator, Crystal Controlled, Type 1 (Crystal Oscillator (XO)), 50 Hz Through 50 MHz, Hermetic Seal, Square Wave, TTL
$3.6
MIL MIL-PRF-55310/8H
Published Date: 10/07/2004
OSCILLATOR, CRYSTAL CONTROLLED, TYPE 1 (CRYSTAL OSCILLATOR (XO)), 50 HZ THROUGH 50 MHZ, HERMETIC SEAL, SQUARE WAVE, TTL (SUPERSEDING MIL-PRF-55310/8G)
$7.2
MIL MIL-PRF-55310/8G
Published Date: 07/08/2002
OSCILLATOR, CRYSTAL CONTROLLED, TYPE 1 (CRYSTAL OSCILLATOR (XO)), 50 HZ THROUGH 50 MHZ, HERMETIC SEAL, SQUARE WAVE, TTL (SUPERSEDING MIL-PRF-55310/8F) (S/S BY MIL-PRF-55310/8H)
$7.2
MIL MIL-PRF-55310/8F
Published Date: 03/25/1998
OSCILLATOR, CRYSTAL CONTROLLED, TYPE 1 (CRYSTAL OSCILLATOR (XO)), 50 HZ THROUGH 50 MHZ, HERMETIC SEAL, SQUARE WAVE, TTL (SUPERSEDING MIL-O-55310/8E) (S/S BY MIL-PRF-55310/8G)
$7.2

Related products

MIL MIL-PRF-3098/132E
Published Date: 07/28/2011
Crystal Unit, Quartz, CR151/U (No S/S Document)
$3.6
MIL MIL-C-3098/14D
Published Date: 06/23/1975
CRYSTAL UNIT, QUARTZ, CR-33A/U (SUPERSEDING MIL-C-3098/14C) (S/S BY MIL-PRF-3098/14E)
$7.2
MIL MIL-PRF-3098/79F
Published Date: 08/07/2009
Crystal Unit, Quartz, CR104/U
$3.6

Best-Selling Products

SN-INSTA/TS 950:2014
Published Date: 04/30/2014
Fire Safety Engineering - Comparative method to verify fire safety design in buildings
SN-INSTA/TS 952:2019
Published Date: 08/20/2019
Fire Safety Engineering - Review and Control in the Building Process