MIL-STD-2003B covers shipboard installation requirements for electrical cable, equipment, penetrations, cableways, and connectors. This standard consists of this general standard and five parts as follows: Part 1 (Cable) Preparation and end-sealing, entry to equipment and connectors, repair and splicing. Part 2 (Equipment) Equipment mounting, switchboard mounting, battery equipment, casualty power, and shore power. Part 3 (Penetrations) Swage tubes, stuffing tubes, kickpipes, surface ships and submarines, hull penetration, and general. Part 4 (Cableways) General, submarine, surface ship and cable protection. Part 5 (Connectors) Cable and conductor preparation in accordance with MIL-C-81511, MIL-DTL-5015, MIL-DTL-26482, MIL-DTL-28840, MIL-DTL-22992, and MIL-DTL-38999 connectors.
| File Size : | 1
file
, 150 KB |
| Note : | This product is unavailable in Ukraine, Russia, Belarus |
| Number of Pages : | 8 |
| Published : | 10/06/2020 |