MODUK DEF STAN 00-56: PART 1 PDF

MODUK DEF STAN 00-56: PART 1 PDF

Name:
MODUK DEF STAN 00-56: PART 1 PDF

Published Date:
04/02/2015

Status:
[ Revised ]

Description:

Safety Management Requirements for Defence Systems Part 1: Requirements and Guidance

Publisher:
British Defence Standards

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
Need Help?

Scope and Applicability

This Standard specifies the requirements for achieving, assuring and managing the safety of PSS defined by the scope of contract.

This Standard provides the Contractor with guidance for compliance with the requirements, thereby supporting the MOD in meeting their obligations with regard to the management of Risk to Life associated with the operation of military systems.

This Standard considers that a product can be an engineering artefact, whether physical, data or software, from the small scale, such as a pump or a digital map, to the large scale, such as a ship or a geographically distributed logistics application.

This Standard considers that a system is a combination of elements, with defined boundaries, which are used together in a defined operating environment to perform a given task or achieve a specific purpose. These elements may include personnel, procedures, materials, tools, products, facilities, services and/or data as appropriate.

This Standard considers a Service to be any activity using a System, eg providing air-to-air refuelling, running a naval dockyard, or calculating the safe flight envelope for an aircraft, which are provided by the Contractor.

The Contractor, together with the MOD, has responsibility for safety of all deliverable PSS. This Standard is intended to cover the full range of possibilities including:

a) Where the Contractor has visibility and understanding of in-service Risk to Life, and can design PSS taking operation into account.

b) Where the Contractor does not have visibility of in-service Risk to Life but is responsible for providing information to those who are responsible for in-service Risk to Life of the PSS.

The MOD considers all Defence Lines of Development for PSS, but this may not be included in the scope of contract, eg Concepts and Doctrine would consider Risk to Life and would be a MOD responsibility.

The responsibility of the Contractor also varies with the scope of analysis. This Standard is intended to cover the full range of possibilities including:

a) Enhanced, where the Contractor carries out safety engineering and safety management, for the duty holder, beyond the deliverable PSS.

b) Full, where the Contractor carries out safety engineering and safety management for the deliverable PSS.

c) Reduced, where the Contractor carries out safety engineering and safety management only for parts or aspects of the deliverable PSS, eg for maintenance of a product.

The scope of analysis is intended to be adapted to the wide range of possible MOD acquisition scenarios.

Guidance on MOD safety management is available through the AOF.

Note. In the DAE, the aviation Duty Holder or Accountable Manager (Military Flying) as defined in MAA02 and RA1024, are the designated posts who can accept risks as being tolerable and ALARP.

Whilst Contract life may be limited, this Standard considers the whole life cycle of the PSS, including disposal. Various phases of the life of the PSS that need to be considered should be explicitly included within the scope of analysis. This applies to all in-service situations and scenarios including, but not limited to, trials, operations and training for operations as defined in the Contract.

This Standard applies to all acquisition scenarios and all PSS but the responsibility of the Contractor varies with the scope of supply.

The distinction between scope of supply and scope of analysis is intended to facilitate the clear definition of the Contractor's responsibilities.

The scope of analysis may be extended beyond the scope of supply particularly where the contracted activity is limited to early phases of the CADMID/T cycle. The scope of analysis may need to cover the full CADMID/T cycle.

This Standard applies to PSS that have identified duty holders, supported by Safety Committees and relevant stakeholders.

For all PSS to which this Standard is applied, a crown servant will retain responsibility and accountability for the Risk to Life. The scope of contract is agreed between the MOD and the Contractor and would identify duty holders and relevant stakeholders who are responsible for managing safety of the PSS. The relevant stakeholders may include representatives from MOD and Industry (for other related PSS) that may impact the PSS safety interfaces.

The mechanism for managing safety is through the agreed Safety Committees. Terms of Reference and membership will be specific to the scope of contract.


Edition : I6
Number of Pages : 140
Published : 04/02/2015

History

MODUK DEF STAN 00-056: PART 01
Published Date: 10/14/2023
Safety Management Requirements for Defence Systems Part: 01: Requirements and Guidance
MODUK DEF STAN 00-56: PART 1
Published Date: 02/28/2017
Safety Management Requirements for Defence Systems Part 1: Requirements
MODUK DEF STAN 00-56: PART 1
Published Date: 04/02/2015
Safety Management Requirements for Defence Systems Part 1: Requirements and Guidance
MODUK DEF STAN 00-56: PART 1
Published Date: 01/29/2014
Safety Management Requirements for Defence Systems - Part 1: Requirements and Guidance
MODUK DEF STAN 00-56: PART 1
Published Date: 01/29/2014
Safety Management Requirements for Defence Systems - Part 1: Requirements and Guidance
MODUK DEF STAN 00-56: PART 1
Published Date: 06/01/2007
Safety Management Requirements for Defence Systems Part 1 Requirements
MODUK DEF STAN 00-56: PART 1
Published Date: 12/17/2004
Safety Management Requirements for Defence Systems Part 1 Requirements

Related products

MODUK DEF STAN 40-8
Published Date: 10/30/1998
Cord, Lacing and Tape Lacing Including Limited Fire Hazard Variants
$1.8

Best-Selling Products

EJMA EJMA STANDARDS
Published Date: 07/01/2015
Standards of the Expansion Joint Manufacturers Association, Inc. - Includes one copy of Practical Guide to Expansion Joints
$172.8