Name:
MODUK DEF STAN 59-41: PT 3: SUPP K PDF
Published Date:
01/01/1995
Status:
[ Cancelled ]
Publisher:
British Defence Standards
Purpose
The purpose of this test is to ensure that transients of specified characteristics injected on to the power supply and interconnecting cables of EUT will not cause damage, degradation of performance or malfunction. The transients shall be injected in the form of damped sinusoids, at the frequencies to which the EUT is most likely to be susceptible. Two types of transient are used, Type 1 (2 MHz - 30 MHz) representing transients produced by switching, for example by contactor operation. Type 2 (100 kHz) transients simulate voltage spikes which the EUT may experience during group switching of equipments.
| Edition : | I5 |
| File Size : | 1 file , 510 KB |
| Number of Pages : | 16 |
| Published : | 01/01/1995 |