MODUK DEF STAN 59-411: PART 5 PDF

MODUK DEF STAN 59-411: PART 5 PDF

Name:
MODUK DEF STAN 59-411: PART 5 PDF

Published Date:
01/23/2007

Status:
[ Revised ]

Description:

Electromagnetic Compatibility Part 5 Code of Practice for Tri-Service Design and Installation

Publisher:
British Defence Standards

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
moduk-def-stan-59-411-part-5_2798116

Choose Document Language:
0
Need Help?

This Tri-service Design and Installation Code of Practice provides guidance to Project Managers and Design Team Members in industry as well as to Project Managers and Advisors in MOD. It provides guidance for all phases of design from initial concept through to in service maintenance and modification.

This Part of the Defence Standard is applicable to all electrotechnical equipment and installations (to be installed in Air Platforms, Land Vehicles, Surface Ships and Submarines).

This Standard is only intended to provide guidance on the electromagnetic compatibility of equipment and systems and their installation, and other aspects including safety, reliability and maintainability must be taken into account when applying the recommended measures.

EMC test methods and limits are covered in Parts 3 and 4 of this Standard.

The measures recommended for achieving EMC will also assist in providing Nuclear Electromagnetic Pulse (NEMP) Hardening and lightning (LEMP) hardening.

Severe EMC problems are likely to arise in non-metallic platforms i.e. ships, (e.g. glass reinforced plastic) requiring special techniques to be adopted. Specific platform requirements related to the electromagnetic scenario are discussed in the three service annexes as appropriate.


Edition : I1
Number of Pages : 298
Published : 01/23/2007

History

MODUK DEF STAN 59-411: PART 5
Published Date: 06/14/2019
Electromagnetic Compatibility Part: 05 : Code of Practice for Tri- Service Design and Installation
24.60 €
MODUK DEF STAN 59-411: PART 5
Published Date: 03/31/2014
Electromagnetic Compatibility Part 5: Code of Practice for Tri-Service Design and Installation
MODUK DEF STAN 59-411: PART 5
Published Date: 01/23/2007
Electromagnetic Compatibility Part 5 Code of Practice for Tri-Service Design and Installation
MODUK DEF STAN 59-411: PART 5
Published Date: 01/23/2007
Electromagnetic Compatibility Part 5 Code of Practice for Tri-Service Design and Installation

Related products

MODUK DEF STAN 00-810: PART 15
Published Date: 08/18/2006
Marking of Ammunition and Associated Packages Part 15 Experimental Ammunition
0.60 €

Best-Selling Products

NETA ATS-2009
Published Date: 02/19/2009
Standard for Acceptance Testing Specifications for Electrical Power Equipment and Systems, 2009 Edition
247.50 €
NETA ATS-2013
Published Date: 2013
Standard for Acceptance Testing Specifications for Electrical Power Equipment and Systems, 2013 Edition
82.50 €
NETA ATS-2017
Published Date: 2017
Standard for Acceptance Testing Specifications for Electrical Power Equipment and Systems, 2017 Edition (Errata Included)
87.00 €
NETA ATS-2021
Published Date: 09/18/2020
Standard for Acceptance Testing Specifications for Electrical Power Equipment and Systems, 2021 Edition
87.00 €
NETA ECS-2020
Published Date: 2020
Standard for Electrical Commissioning Specifications for Electrical Power Equipment and Systems, 2020 Edition
57.00 €
NETA ECS-2024
Published Date: 2024
Standard for Electrical Commissioning Specifications for Electrical Power Equipment & Systems, 2024 Edition
62.70 €