NACE AMPP SP21518-2022 PDF

NACE AMPP SP21518-2022 PDF

Name:
NACE AMPP SP21518-2022 PDF

Published Date:
01/18/2022

Status:
Active

Description:

Recovery and Repassivation after Low pH Excursions in Open Recirculating Cooling Water Systems

Publisher:
National Association of Corrosion Engineers

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$53.7
Need Help?

The scope of this standard practice is that of pH depression detection, correction, and restoration to safe operating conditions that ensure future avoidance of excessive corrosion and fouling rates as well as process throughput capacity derating. A discussion of the importance of preplanning, the elements that comprise it, in the form of a check list and populated tables containing the types of chemicals, their federate and inventory required that are site specific for the cooling system volume and maximum blowdown rates are provided. Auditing and identifying high-risk unit processes that could be a source of low pH ingressors to be completed. Sampling and monitoring the outlets of the high-risk areas with the appropriate on-line sensors or grab sample test apparatus with sufficient reagent inventories are also noted. Knowledge of the site environmental discharge limits and the management of the cooling system discharge during the recovery are addressed. The contingency processes to restore the pH, recover from excursion and completion of repassivation are based upon four degrees of severity associated with excursions. The individual contingencies are defined in the text and illustrated in Figure 1.


File Size : 1 file , 790 KB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 30
Published : 01/18/2022

History


Related products

NACE 6A192
Published Date: 12/01/2000
Dehumidification and Temperature Control During Surface Preparation, Application, and Curing for Coatings/Linings of Steel Tanks, Vessels, and Other Enclosed Spaces
$53.7
NACE SP0187-2008
Published Date: 06/20/2008
Design Considerations for Corrosion Control of Reinforcing Steel in Concrete
$53.7
NACE TM0497-2022
Published Date: 03/01/2022
Measurement Techniques Related to Criteria for Cathodic Protection on Underground or Submerged Metallic Piping Systems
$53.7

Best-Selling Products

BIFMA Color 3.1-2005
Published Date: 2009
Standard for Color Measurement for Office Furniture Manufacturers and Suppliers
BIFMA G1-2002
Published Date: 2002
2001 Ergonomics Guideline
BIFMA G1-2013 Guideline
Published Date: 2013
Ergonomics Guideline: Ultimate Test for Fit
BIFMA G1-2013
Published Date: 2013
2013 Ergonomics Guideline for Furniture used in Office Work Spaces Designed for Computer Use
BIFMA HCF 8.1-2017
Published Date: 2017
Health Care Furniture Design Guidelines For Cleanability
BIFMA HCF 8.1-2019
Published Date: 2019
Health Care Furniture Design Guidelines For Cleanability