NATO AEP-55 VOL 2 PDF

NATO AEP-55 VOL 2 PDF

Name:
NATO AEP-55 VOL 2 PDF

Published Date:
09/01/2006

Status:
[ Revised ]

Description:

PROCEDURES FOR EVALUATING THE PROTECTION LEVEL OF LOGISTIC AND LIGHT ARMOURED VEHICLES VOLUME 2 FOR MINE THREAT

Publisher:
NATO Publication

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
Need Help?

This document describes the threat definitions, test conditions and crew casualty/injury criteria of vehicle occupants to be used when determining the protection level of logistic and light armoured vehicles subject to grenade and blast mine threats level 1-4. These threats are defined by NATO STANAG 4569 Annex B (summarised at Annex A of this document).

Where stated in this document the National Authority (NA) is an appointed expert.


Edition : ED1
Number of Pages : 51
Published : 09/01/2006

History

NATO AEP-55 VOL 2
Published Date: 05/23/2014
PROCEDURES FOR EVALUATING THE PROTECTION LEVEL OF ARMOURED VEHICLES - MINE THREAT - Volume 2
NATO AEP-55 VOL 2
Published Date: 08/01/2011
PROCEDURES FOR EVALUATING THE PROTECTION LEVEL OF ARMOURED VEHICLES VOLUME 2 FOR MINE THREAT
NATO AEP-55 VOL 2
Published Date: 09/01/2006
PROCEDURES FOR EVALUATING THE PROTECTION LEVEL OF LOGISTIC AND LIGHT ARMOURED VEHICLES VOLUME 2 FOR MINE THREAT

Related products


Best-Selling Products

FORD AWX
Published Date: 12/01/1993
WIRE, TAMPICO, AND SYNTHETIC FILAMENT POWER WHEEL BRUSHES APPLICATIONS AND GENERAL INFORMATION
$9
FORD B2BBX
Published Date: 09/01/1991
ONE-STEP PAINT LINE CLEANING PROCEDURE
$9
FORD B2F1
Published Date: 02/01/1978
ANODIC ELECTROCOATING SYSTEM CLEANING AND MAINTENANCE
$9
FORD B2GX
Published Date: 04/01/1984
PAINT BAKE OVENS CLEANING AND MAINTENANCE
$9
FORD BAX-1
Published Date: 07/01/1977
PAINT SPRAYING SYSTEMS, SMALL PARTS, AUTOMATIC
$9
FORD BAX-2
Published Date: 07/01/1985
PAINT SPRAY BOOTH BACK SECTION ACCEPTANCE TEST
$9