NAVY UFGS-01 32 16.00 20 PDF

NAVY UFGS-01 32 16.00 20 PDF

Name:
NAVY UFGS-01 32 16.00 20 PDF

Published Date:
08/01/2018

Status:
[ Revised ]

Description:

SMALL PROJECT CONSTRUCTION PROGRESS SCHEDULES

Publisher:
Naval Sea Systems Command

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$10.2
Need Help?

NOTE: This guide specification applies to Design-Build and Design-Bid-Build projects and covers the requirements for the preparation and use of construction schedules for small projects. The small projects covered by this specification may be simple or complex, but would not benefit from the use of a cost-loaded Network Analysis Schedule (NAS) as required by Section 01 32 17.00 20 COST LOADED NETWORK ANALYSIS SCHEDULES (NAS). This specification includes two schedule options to choose from based on the complexity of the project. Edit this specification by choosing the desired scheduling option described below.

Confirm with the Administering FEAD/ROICC that the project schedule should be prepared under the requirements of this section. Further, this section should be reviewed and approved by the Administering FEAD/ROICC prior to completion of the Request for Proposal.

Option 1: "Non-Cost Loaded Network Analysis Schedule (NAS)" – This is the NAVFAC preferred schedule for use on most small projects and requires either Primavera P6 or Microsoft Project 2010 scheduling software to be used. Option is provided for cost-loading Microsoft Project 2010 schedules at NAVFAC OCONUS locations where Primavera P6 support is not currently available.

Option 2: "Bar Chart Schedule" – In lieu of Option 1 for non-complex projects or projects with minimal disciplines, a simple bar chart (Non-NAS) may be specified. Project examples include: paving, painting, roof replacement, and lighting.

Coordination is required with Section 01 20 00.00 20 PRICE AND PAYMENT PROCEDURES, with selection of "Schedule of Prices" for bar charts and non-cost-loaded NAS, or "Earned Value Report" for cost-loaded Microsoft Project 2010 schedules.


Edition : 18
File Size : 1 file , 67 KB
Number of Pages : 15
Published : 08/01/2018

History


Related products

NAVY DI-PSSS-82325A
Published Date: 10/27/2020
OEM MAINTENANCE HISTORY DATA
$9.3
NAVY UFGS-08 52 00
Published Date: 08/01/2011
WOOD WINDOWS
$9.9
NAVY UFGS-08 81 00
Published Date: 05/01/2019
GLAZING
$12
NAVY UDI-E-25560
Published Date: 12/15/1975
TRAINER 35MM COLOR SLIDE TRANSPARENCIES
$8.1

Best-Selling Products

SN/TS 3031:2016
Published Date: 11/15/2016
Energy performance of buildings - Calculation of energy needs and energy supply
SN/TS 3032:2024
Published Date: 07/05/2024
Energy performance of buildings - Calculation of heating, cooling and power demand
SN/TS 3079:2010
Published Date: 04/28/2010
Strength graded structural timber - Dimensions
SN/TS 3160:2017
Published Date: 10/01/2017
Module based doors, windows and recessing for locking systems
SN/TS 3183:2008
Published Date: 12/01/2008
Solid softwood panelling for interior use
SN/TS 3186:2008
Published Date: 12/01/2008
Solid softwood cladding for exterior use