Name:
NAVY UFGS-01 32 17.00 20 PDF
Published Date:
05/01/2018
Status:
[ Revised ]
Publisher:
Naval Sea Systems Command
NOTE:
This guide specification applies to Design-Bid-Build and Design-Build projects and covers the preparation and use of Cost-Loaded Network Analysis Schedules (NAS) for construction using Primavera P6.
| Edition : | 18 |
| File Size : | 1 file , 100 KB |
| Number of Pages : | 24 |
| Published : | 05/01/2018 |