Name:
NAVY UFGS-07 52 00 PDF
Published Date:
05/01/2012
Status:
[ Active ]
Publisher:
Naval Sea Systems Command
NOTE:
This guide specification covers the requirements for modified bitumen sheet roofing. Hot mopped asphalt, torch applied, hot air, and cold-applied adhesive applications are included on both existing and new roof systems with slopes from 6 mm to 76 mm 1/4 inch to 3 inches per foot. Both SBS and APP modified bitumen membranes are included.
| Edition : | 12 |
| File Size : | 1 file , 210 KB |
| Number of Pages : | 47 |
| Published : | 05/01/2012 |