NG AS009 PDF

NG AS009 PDF

Name:
NG AS009 PDF

Published Date:
04/01/2013

Status:
[ Active ]

Description:

Asset Management Business Procedures - Site Communication Requirements

Publisher:
National Grid

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$55.2
Need Help?

PURPOSE AND SCOPE

This procedure details site communications required when personnel enter and leave National Grid controlled sub-station sites and those required to be initiated by the Electricity National Control Centre (ENCC) and the Network Operations Centre (NOC) under certain emergency conditions. It makes reference to ‘Lone Working’ requirements that are specifically covered in NGUK/PM/SHE/104 and AMBP 209and should form part of the site induction process for contractors UK/BP/SE 410.


Edition : 2
File Size : 1 file , 48 KB
Number of Pages : 8
Published : 04/01/2013

History


Related products

NG CH 32
Published Date: 03/01/2010
Commissioning Handbook - Commissioning Application of TP107 to Mitsubishi HA / HSA relays
$55.2
NG TS 3.24.67
Published Date: 11/01/2015
National Grid Technical Specifications - GPS Substation Clock
$55.2
NG TS 3.04.13
Published Date: 10/01/2000
National Grid Technical Specifications - GZTACSR Conductor and Fittings for Overhead Lines
$55.2
NG TS 3.24.35
Published Date: 05/01/2000
National Grid Technical Specifications - Non-Unit Feeder Protection
$55.2

Best-Selling Products

ADS A62403-432
Published Date:
Assembly of Clamp, Loop Style, Box Cushion
ADS AGS1000
Published Date: 07/13/1960
Clip - Hose, Type 'S'. General Arrangement
ADS AGS1001
Published Date: 08/30/1938
R.A.E. Petrol Filter (200 G.P.H. Shallow Sump Type)
ADS AGS1002
Published Date: 08/20/1938
R.A.E. Petrol Filter
ADS AGS100
Published Date: 07/01/1977
AGS Design Notes
ADS AGS1010
Published Date: 12/03/2015
Standard Compressed Air Bottle Assemblies