NG NGUK/CD/BP 213E PDF

NG NGUK/CD/BP 213E PDF

Name:
NG NGUK/CD/BP 213E PDF

Published Date:
10/01/2014

Status:
[ Active ]

Description:

UK Capital Delivery Business Procedures - Avoidance of Buried Services

Publisher:
National Grid

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$55.2
Need Help?

PURPOSE AND SCOPE

National Grid Capital Delivery is seeking to eliminate inadvertent contacts with buried services during construction activities and to eradicate the associated risks to workers. This Business Procedure will allocate responsibilities to the Development Engineer to identify Information for inclusion in the Enquiry Document and the Construction Interface Engineers to ensure that the Contractor has suitable methods in place to manage buried hazards.

The principles of the HSE Guidance document HS(G)47 – Avoiding Danger from Underground Services, details the minimum standard to achieve legal compliance. However, National Grid endeavours to achieve "best practice" on all safety, health, and environment issues.

Capital Delivery (Electricity) has therefore raised the standard of avoidance management by;

  •  Adopting a "Safety by Design" philosophy
  •  Advocating advanced planning and preparation of high risk activities
  •  The safe positive location of buried services.

Only after such exhaustive and disciplined preparation should tightly controlled and managed excavation be allowed to continue.

This CD/BP addresses the end-to-end construction process. Effective Management from feasibility and design through to on-site delivery will eliminate the dangers from underground services.


Edition : 3
File Size : 1 file , 45 KB
Number of Pages : 9
Published : 10/01/2014

History


Related products

NG DH 25
Published Date: 12/01/2012
Design Handbook - Guidance On The Design and Use of Temporary Scaffold Guards
$266.4
NG TR(E) 453
Published Date: 05/01/2009
Technical Reports - Review of The Potential Effects of Wind Turbine Wakes On Overhead Transmission Lines
$138
NG CH 31
Published Date: 03/01/2013
Commissioning Handbook - LiveLink MARS User Guide for Commissioning Engineer (National Grid)
$55.2
NG TGN(E) 176
Published Date: 08/01/2001
Technical Guidance Notes - Sequential Disconnection on the 275 kV and 400 kV Networks
$138

Best-Selling Products