NG SCT 16.05 PDF

NG SCT 16.05 PDF

Name:
NG SCT 16.05 PDF

Published Date:
06/01/1998

Status:
[ Active ]

Description:

Site Commissioning Tests - Commissioning Schedule for System Monitoring Equipment (SME) Supplied by Hathaway Power Instrumentation Ltd

Publisher:
National Grid

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$55.2
Need Help?

This Schedule deals with the following:-

(1) Commissioning of the SME equipment.

(ii) Verification of input signal wiring, external communications and alarm outputs.

This Schedule specifically does not include for commissioning of any associated transducers.


Edition : 3
File Size : 1 file , 180 KB
Number of Pages : 21
Published : 06/01/1998

History


Related products

NG TS 3.09.06
Published Date: 09/01/1992
Technical Specifications (NGTS) - Digital and Analogue Panel Meters
$55.2
NG TGN(E) 215
Published Date: 04/01/2006
Technical Guidance Notes - Terminal Tower Earthing With a Temporary Bond Prior to The Reinstatement of The Fixed Earth With A Permanent Repair
$55.2
NG SCT 04.01
Published Date: 10/01/1998
Site Commissioning Tests - Disconnector - Motorized
$55.2
NG SCT 34
Published Date: 08/01/1998
Site Commissioning Tests - Ericsson DCX-5 Control Telephone Exchange Using ASNR 50101\R2 Software
$55.2

Best-Selling Products

AOAC METHODS
Published Date: 01/01/2002
AOAC OFFICIAL METHODS OF ANALYSIS
AOAC METHODS
Published Date: 01/01/2007
AOAC OFFICIAL METHODS OF ANALYSIS
AOAC METHODS
Published Date: 01/01/1990
AOAC OFFICIAL METHODS OF ANALYSIS
$135
AOAC METHODS
Published Date: 01/01/1995
AOAC OFFICIAL METHODS OF ANALYSIS
AOAC METHODS
Published Date: 01/01/2006
AOAC OFFICIAL METHODS OF ANALYSIS
AOAC METHODS
Published Date: 01/01/1999
AOAC OFFICIAL METHODS OF ANALYSIS