Name:
NG SCT 44 PDF
Published Date:
08/01/1998
Status:
[ Active ]
Publisher:
National Grid
INTRODUCTION
The purpose of this document is to:-
(i) Specify procedures to provide evidence of the time, date and status/configuration of the system being taken into service.
(ii) Define the tests to be carried out for commissioning Nokia and associated communications equipment for SCADA systems.
(iii) Provide Pro-Forma documentation for the results of the above tests for assistance with future fault location and upgrade requirements.
| Edition : | 2 |
| File Size : | 1 file , 460 KB |
| Number of Pages : | 76 |
| Published : | 08/01/1998 |