NG TGN(E) 027 PDF

NG TGN(E) 027 PDF

Name:
NG TGN(E) 027 PDF

Published Date:
03/01/2005

Status:
[ Revised ]

Description:

Technical Guidance Notes - Application Guidelines for Over-Voltage Protection In Substations Using Surge Arresters

Publisher:
National Grid

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
ng-tgn-e-027_2782934

Choose Document Language:
0
Need Help?

PURPOSE AND SCOPE

This Technical Guidance Note (TGN) addresses the application of metal oxide surge arresters to provide over-voltage control of substation primary plant on the National Grid Transmission (Electricity) system. Surge arresters are deployed for the surge protection of transformers, reactors, gas insulated switchgear (GIS) substations and for some reactive compensation. This document supports the policy statement PS(T)021 ‘Surge arresters for substations', implements the recommendations made in TR(E) 409 ‘Over-voltage protection in substations using surge arresters' and provides further information on the requirements detailed in the policy.

This document does not cover the over-voltage protection of overhead line circuits, sheath voltage limiters (SVL) for cable bonding systems, HVDC converters and power electronics.


Edition : 2
Number of Pages : 11
Published : 03/01/2005

History

NG TGN(E) 027
Published Date: 10/01/2016
Technical Guidance Notes - Overvoltage Protection of Substation Equipment
172.50 €
NG TGN(E) 027
Published Date: 03/01/2005
Technical Guidance Notes - Application Guidelines for Over-Voltage Protection In Substations Using Surge Arresters

Related products

NG SCT 20.03
Published Date: 01/01/2000
Site Commissioning Tests - Tripping and Auxiliary Relays
55.20 €
NG TPS 2.7.1
Published Date: 09/01/2000
Transmission Plant Specifications - Provision of Information and Controls to National Grid Control Points and Other Users
55.20 €
NG SCT 20.02
Published Date: 01/01/2000
Site Commissioning Tests - Current Transformers Primary Injection Tests
55.20 €
NG UKBP/TP 106
Published Date: 04/01/2016
UK Business Procedure/Transmission Procedures - Equipment Commissioning & Decommissioning
147.30 €

Best-Selling Products

Design for Earthquakes
Published Date: 01/01/1997
I C B O 9033C92
Published Date: 01/01/1992
CABO/ANSI A117.1 Commentary
ICBO 108H01
Published Date:
Principles of Fire Behavior
ICBO 108H02
Published Date:
Design of Water-Based Fire Protection Systems
ICBO 108H03
Published Date:
Hazardous Materials