NG TGN(E) 269 PDF

NG TGN(E) 269 PDF

Name:
NG TGN(E) 269 PDF

Published Date:
01/01/2014

Status:
[ Active ]

Description:

Technical Guidance Notes - Settlement Metering – Overall Accuracy and Uncertainty

Publisher:
National Grid

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$138
Need Help?

PURPOSE AND SCOPE

This Technical Guidance Note provides an assessment of the overall accuracy and associated uncertainty achieved by National Grid Settlement Metering installations.

Since the metering systems utilize a range of different metering equipment and include site specific features this is a generic assessment and includes worst case elements.

The assessment can be used as supporting evidence for the requirements of Metering Code of Practice One (COP 1) with respect to Overall Accuracy. The assessment applies to the standard NG three phase four wire metering installations which comprise the great majority of applications.

Informative: Site specific calculated values of metering system error (which only excludes the actual energy meter error) are included in a spreadsheet / database which is used for meter compensation purposes to reduce the total overall operating error of a given metering system.

Informative: Metering Codes of practice are industry documents available on the Elexon website.

 


Edition : 1
File Size : 1 file , 120 KB
Number of Pages : 15
Published : 01/01/2014

History


Related products

NG TS 3.24.65
Published Date: 06/01/2000
National Grid Technical Specifications - Overall Protection
$55.2
NG TS 2.19
Published Date: 12/01/2005
Technical Specifications - Ancillary Light Current Equipment
$55.2
NG TS 3.24.07
Published Date: 05/01/2000
National Grid Technical Specifications - Feeder Bay Functions
$55.2
NG TS 3.04.02
Published Date: 03/01/2011
Technical Specifications - Conductors for Overhead Lines
$55.2

Best-Selling Products

NG AMBP 051
Published Date: 09/01/2010
Asset Management Business Procedure - The Implementation of Construction (Design & Management) Regulations (CDM) 2007. Delivery of Asset Management Maintenance Delivery Electricity Minor Schemes
$138
NG AMBP 051
Published Date: 08/01/2015
Asset Management Business Procedure - Implementation of Construction (Design & Management) Regulations (CDM) 2015. Delivery of ETAM Operation Projects and Temporary Works Coordination for Construction
$138
NG AMBP 130
Published Date: 06/01/2018
Asset Management Business Procedure - Management of OHL Work in ETO Operations
$138
NG AMBP 130
Published Date: 02/01/2011
Asset Management Business Procedure - Guidance for Planning of Work on or Near to High Voltage Overhead Lines
$138
NG AMBP 136
Published Date: 10/01/2013
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
NG AMBP 136
Published Date: 01/01/2015
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
$138