NG TGN(T) 043 PDF

NG TGN(T) 043 PDF

Name:
NG TGN(T) 043 PDF

Published Date:
01/01/1993

Status:
[ Revised ]

Description:

Technical Guidance Notes - General Requirements for the Installation of Optical Cable in Protective Ducts

Publisher:
National Grid

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$138
Need Help?

This document provides general guidelines for the installation of 32 mm diameter (nominal) subduct into 100 mm diameter underground ducting, pulling in optical cable, splicing, identifying cable ends and testing the installed cable.

The construction of underground ducting, draw boxes, splice boxes and above ground equipment pedestals shall be constructed in accordance with specification NGTS 3.8.22.


Edition : 1
File Size : 1 file , 100 KB
Number of Pages : 9
Published : 01/01/1993

History

NG TGN(E) 043
Published Date: 11/01/2017
Technical Guidance Notes - GENERAL REQUIREMENTS FOR THE INSTALLATION OF OPTICAL CABLE IN PROTECTIVE DUCTS
$138
NG TGN(T) 043
Published Date: 01/01/1993
Technical Guidance Notes - General Requirements for the Installation of Optical Cable in Protective Ducts
$138

Related products

NG TGN(E) 152
Published Date: 09/01/2018
Technical Guidance Notes - Location of Substation Sites with an Earth Potential Rise Under Fault Conditions Above 650v (Hot Sites)
$69
NG UKBP/TP 236
Published Date: 04/01/2018
UK Business Procedure/Transmission Procedure - Key Transmission Procedure Minimum Requirements as Applied to The Delivery of Electricity Transmission Single Asset Replacment/refurbishment/recondition Investments
$147
NG TS 3.06.08
Published Date: 03/01/1999
National Grid Technical Specifications - Circuit Breaker Fail Protection
$55.2
NG DH 08
Published Date: 04/01/2014
Design Handbook - Guidance On The Preparation of Settings for Non-Unit (Distance Protection for 400 & 275kv Feeders
$55.2

Best-Selling Products