NG UKBP/TP 127 PDF

NG UKBP/TP 127 PDF

Name:
NG UKBP/TP 127 PDF

Published Date:
12/01/2013

Status:
[ Revised ]

Description:

UK Business Procedure/Transmission Procedures - Lifetime Management of Substation Control Systems

Publisher:
National Grid

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$138
Need Help?

PURPOSE AND SCOPE

This Procedure describes the processes involved and the stakeholder responsibilities in the lifetime management of Substation Control Systems (including METRO).

Key elements of the life cycle are summarised as:

Type Registration.

Investment Application.

Data Management.

Investment Implementation.

Commissioning (covered in TP106)

Post Commissioning Support (covered in PS(T)066).

De-commissioning (covered in TP106)


Edition : 5
File Size : 1 file , 100 KB
Number of Pages : 18
Published : 12/01/2013

History

NG UKBP/TP 127
Published Date: 01/01/2019
UK Business Procedure/Transmission Procedures - Lifetime Management of Substation Control Systems
$138
NG UKBP/TP 127
Published Date: 12/01/2013
UK Business Procedure/Transmission Procedures - Lifetime Management of Substation Control Systems
$138

Related products

NG TS 3.09.12
Published Date: 03/01/1999
Technical Specifications (NGTS) - Electrical Measurement Transducers
$59.1
NG SCT 50
Published Date: 12/01/2005
Site Commissioning Tests - Resistors
$55.2
NG TS 2.01
Published Date: 06/01/2007
Technical Specifications - Substations
$241.5
NG SCT 20.12.09
Published Date: 09/01/1998
Site Commissioning Tests - GEC Alsthom OPTIMHO (LFZP) Distance Protection
$55.2

Best-Selling Products

GPA 101-43
Published Date: 01/01/1994
Standard Compression and Charcoal Tests for Determining the Natural Gasoline Content of Natural Gas
$13.5
GPA 1167-83
Published Date: 1983
GPA Glossary - Definition of Words and Terms Used in the Gas Processing Industry
$16.5
GPA 181-86
Published Date: 01/01/1986
Tentative Reference Bulletin Heating Value as a Basis for Custody Transfer of Natural Gas
$19.5
GPA 194-94
Published Date: 1994
Tentative NGL Loading Practices
$16.5
GPA 2103-20 Errata (July 2021)
Published Date: 2021
Errata (July 2021) to Method for the Analysis of Natural Gas Condensate Mixtures Containing Nitrogen and Carbon Dioxide by Gas Chromatography
Free Download
GPA 2103-20
Published Date: 2020
Method for the Analysis of Natural Gas Condensate Mixtures Containing Nitrogen and Carbon Dioxide by Gas Chromatography
$16.5