NG UKBP/TP 127 PDF

NG UKBP/TP 127 PDF

Name:
NG UKBP/TP 127 PDF

Published Date:
12/01/2013

Status:
[ Revised ]

Description:

UK Business Procedure/Transmission Procedures - Lifetime Management of Substation Control Systems

Publisher:
National Grid

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
ng-ukbp-tp-127_2816073

Choose Document Language:
138.00 €
Need Help?

PURPOSE AND SCOPE

This Procedure describes the processes involved and the stakeholder responsibilities in the lifetime management of Substation Control Systems (including METRO).

Key elements of the life cycle are summarised as:

• Type Registration.

• Investment Application.

• Data Management.

• Investment Implementation.

• Commissioning (covered in TP106)

• Post Commissioning Support (covered in PS(T)066).

• De-commissioning (covered in TP106)


Edition : 5
File Size : 1 file , 100 KB
Number of Pages : 18
Published : 12/01/2013

History

NG UKBP/TP 127
Published Date: 01/01/2019
UK Business Procedure/Transmission Procedures - Lifetime Management of Substation Control Systems
138.00 €
NG UKBP/TP 127
Published Date: 12/01/2013
UK Business Procedure/Transmission Procedures - Lifetime Management of Substation Control Systems
138.00 €

Related products

NG TS 3.09.12
Published Date: 03/01/1999
Technical Specifications (NGTS) - Electrical Measurement Transducers
59.10 €
NG SCT 50
Published Date: 12/01/2005
Site Commissioning Tests - Resistors
55.20 €
NG TS 2.01
Published Date: 06/01/2007
Technical Specifications - Substations
241.50 €
NG SCT 20.12.09
Published Date: 09/01/1998
Site Commissioning Tests - GEC Alsthom OPTIMHO (LFZP) Distance Protection
55.20 €

Best-Selling Products

AI/ASPHALT AI MS-16
Published Date: 03/01/1983
ASPHALT IN PAVEMENT PRESERVATION & MAINTENANCE
AI/ASPHALT AI MS-17
Published Date: 01/01/1969
ASPHALT OVERLAYS FOR HIGHWAY AND STREET REHABILITATION
AI/ASPHALT AI MS-17
Published Date: 06/01/1983
ASPHALT OVERLAYS FOR HIGHWAY AND STREET REHABILITATION
AI/ASPHALT AI MS-17
Published Date: 01/01/2000
ASPHALT OVERLAYS FOR HIGHWAY AND STREET REHABILITATION
AI/ASPHALT AI MS-1
Published Date: 01/01/2008
THICKNESS DESIGN ASPHALT PAVEMENTS FOR HIGHWAYS & STREETS
19.50 €
AI/ASPHALT AI MS-22
Published Date: 01/01/1983
CONSTRUCTION OF HOT MIX ASPHALT PAVEMENTS
8.70 €