NG UKBP/TP 131 PDF

NG UKBP/TP 131 PDF

Name:
NG UKBP/TP 131 PDF

Published Date:
04/01/2015

Status:
[ Revised ]

Description:

UK Business Procedure/Transmission Procedures - Settlement Metering

Publisher:
National Grid

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$138
Need Help?

PURPOSE AND SCOPE

The purpose of this procedure is to ensure that:

• Settlement Metering installations comply with all the relevant standards.

• All documentation is satisfactorily completed and presented to relevant parties in an accurate and timely manner (Appendix A).

• Actions are carried out by the relevant responsible parties to achieve correct and timely completion of Settlement Metering installations (Appendix A).

• Planning, interfaces, standards, time scales and implementation of Settlement Metering Schemes are identified, and to ensure individuals involved in such Schemes are aware of their responsibilities.

• This Procedure covers Settlement Metering requirements at Grid Exit (Supply) Points and Grid Entry Points. The procedure is only applicable to schemes where the requirement for Settlement Metering has been clearly identified; or if the project involves the up-rating of plant resulting in the change of capacity for a given metered supply. In the case of Grid Entry Points the Generator Company (Registrant) may decide to own and provide their own Settlement Metering.

• Responsibility for registering new boundary points with ELEXON rests with Compliance and Notifications Team within Network Service (TNS). The overall responsibility for National Grid’s interface with ELEXON remains with Commercial Frameworks (TNS).

Responsibility for registering the associated boundary point metering system rests with the Registrant (Generator, Distribution System Operator (DSO) or directly connected customer).

It should be noted that replacement of SGTs or changes to plant ratings are to be assessed for their impact on the metering system. Such changes may result in minor alterations to the metering system, and should be undertaken by a Meter Operator Agent who will be contracted by National Grid to undertake any minor works. Such minor alterations are not relevant to the Settlement Metering process outlined in this document, but may require a new or updated registration form.

Specifically excluded from the scope of this document is OFTO metering and metering for site supplies. Responsibility for the supply and registration of site supply metering equipment rests solely


Edition : 4
File Size : 1 file , 82 KB
Number of Pages : 12
Published : 04/01/2015

History


Related products

NG UKBP/TP 236
Published Date: 04/01/2018
UK Business Procedure/Transmission Procedure - Key Transmission Procedure Minimum Requirements as Applied to The Delivery of Electricity Transmission Single Asset Replacment/refurbishment/recondition Investments
$147
NG TS 3.03.01
Published Date: 06/01/2007
Technical Specifications - Mineral Insulating Oil
$55.2
NG TS 3.07.03
Published Date: 04/01/1998
National Grid Technical Specifications - Alarm Grouping
$55.2
NG TS 3.02.07
Published Date: 05/01/2018
Technical Specifications - Bushings for High Voltage Alternating Current Systems
$69

Best-Selling Products

NS-EN ISO/CIE 11664-1:2019
Published Date: 10/01/2019
Colorimetry - Part 1: CIE standard colorimetric observers (ISO/CIE 11664-1:2019)
NS-EN ISO/CIE 11664-2:2022
Published Date: 11/23/2022
Colorimetry - Part 2: CIE standard illuminants (ISO/CIE 11664-2:2022)
NS-EN ISO/CIE 11664-3:2019
Published Date: 10/01/2019
Colorimetry - Part 3: CIE tristimulus values (ISO/CIE 11664-3:2019)
NS-EN ISO/CIE 11664-5:2024
Published Date: 07/01/2024
Colorimetry - Part 5: CIE 1976 L*u*v* colour space and u', v' uniform chromaticity scale diagram (ISO/CIE 11664-5:2024)
NS-EN ISO/CIE 11664-6:2022
Published Date: 10/19/2022
Colorimetry - Part 6: CIEDE2000 colour-difference formula (ISO/CIE 11664-6:2022)