NG UKBP/TP 184 PDF

NG UKBP/TP 184 PDF

Name:
NG UKBP/TP 184 PDF

Published Date:
09/01/2015

Status:
[ Revised ]

Description:

UK Business Procedure/Transmission Procedures - Procedural Requirements for the Management of Temporary Works

Publisher:
National Grid

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$138
Need Help?

PURPOSE AND SCOPE

TemporaryWorks are an integral part of most construction and building projects, however they often comprise unique technical, legal and safety issues in espect of their planning, design, implementation and use.

This document details procedural requirements for the management of Temporary Works on National Grid Electricity Transmission construction projects. These requirements shall be developed by each Principal Contractor into an internal procedure or procedures forming an integral part of the Principal Contractor’s Quality Management system with a view to demonstrating that they have in place effective arrangements for controlling all risks arising from the use of Temporary Works.

The procedural requirements have been developed and mandated to ensure National Grid discharges its duties under the Construction (Design and Management) Regulations 2015 (CDM2015) specifically those of ‘Client’ and to a lesser extent ‘Designer’. In these roles National Grid has no direct influence over TemporaryWorks activities – appointment of designers, scoping of schemes, erection, use and dismantling of systems etc. – however they nonetheless have legal duties to ensure these are implemented competently and safely. Regulation 4 of CDM2015 identifies that “…a client must make suitable arrangements for managing a project…” such that “…the construction work can be carried out, so far as is reasonably practicable, without risks to the health or safety of any person affected by the project…” and

Regulation 8 states that designers and contractors appointed by the Client “…must have the skills, knowledge and experience, and, if they are an organisation, the organisational capability, necessary to fulfil the role that they are appointed to undertake, in a manner that secures the health and safety of any person affected by the project…”. The application of this document contributes, in part, to ensuring those ‘suitable arrangements’ are in place and also, given that National Grid’s contractual position in relation to the management of Temporary Works means that the evaluation of individuals engaged in such activities is not considered appropriate or viable, that the ‘organisational capability’ of Principal Contractors engaged by National Grid is suitable with respect to the safe management of Temporary Works.It shall be noted that this document focuses on those procedural requirements deemed necessary to ensure National Grid discharges its duties under CDM2015 as defined above.

It shall be the responsibility of each Principal Contractor to ensure the TemporaryWorks procedure incorporates those additional tasks and responsibilities necessary to meet its own legal responsibilities (for example


Edition : 3
File Size : 1 file , 100 KB
Number of Pages : 15
Published : 09/01/2015

History

NG UKBP/TP 184
Published Date: 12/01/2018
UK Business Procedure/Transmission Procedures - Procedural Requirements for the Management of Temporary Works
$137.7
NG UKBP/TP 184
Published Date: 09/01/2015
UK Business Procedure/Transmission Procedures - Procedural Requirements for the Management of Temporary Works
$138
NG UKBP/TP 184
Published Date: 11/01/2012
UK Business Procedure/Transmission Procedures - Procedural Requirements for the Management of Temporary Works
$138

Related products

NG TS 3.06.20
Published Date: 03/01/1999
National Grid Technical Specifications - Protection for Bus Sections and Bus Couplers
$55.2
NG DH 08
Published Date: 04/01/2014
Design Handbook - Guidance On The Preparation of Settings for Non-Unit (Distance Protection for 400 & 275kv Feeders
$55.2
NG DH 04
Published Date: 06/01/2014
Design Handbook - Guidance On Policy Application & Setting of Feeder Backup Protection
$42.3
NG TS 3.07.24
Published Date: 01/01/1995
Technical Specifications (NGTS) - Alarm and Event Logging Legends
$55.2

Best-Selling Products