Name:
NG UKBP/TP 192 PDF
Published Date:
10/01/2010
Status:
[ Active ]
Publisher:
National Grid
PURPOSE AND SCOPE
This procedure defines the process by which Safety, Health, Environment, Security & Quality (SHESQ), Lessons Learned and Best Practice bulletins are generated by the Construction Delivery Units (CDU) and shared by Construction Technical Assurance. It also defines the means by which National Grid SHESQ Bulletins, Operation Engineering Bulletins (OESB), Technical Specifications (TS), Electricity Transmission Construction Engineering Bulletins and Third Party Bulletins are distributed.
| Edition : | 4 |
| File Size : | 1 file , 33 KB |
| Number of Pages : | 5 |
| Published : | 10/01/2010 |