NG UKBP/TP 199 PDF

NG UKBP/TP 199 PDF

Name:
NG UKBP/TP 199 PDF

Published Date:
07/01/2013

Status:
[ Withdrawn ]

Description:

UK Business Procedure/Transmission Procedures - Operation and Management of the CPM Livelink System

Publisher:
National Grid

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$55.2
Need Help?
W/D NO S/S

PURPOSE AND SCOPE

This business procedure is to outline the purpose, management and operation of CPM Livelink (www.proj.info).

CPM Livelink and Enterprise Content Management (ECM) are separate instances of document management systems used by National Grid to support key company processes. ECM is used predominantly for engineering records and master drawings custodianship, and control of modifications to transmission systems (gas and electricity). CPM Livelink’ (or ‘proj.info’) delivers Collaborative Project Management (CPM) functionality. The Scope of this procedure is limited to CPM Livelink.

CPM Livelink is an external web-based application for storing, sharing, and distributing information between National Grid and the Delivery Vehicles, and for facilitation of business processes. It provides a collaborative working environment to manage information and to ensure that Key Project Documents and Supporting Material are made available and fully auditable for all key stakeholders and appropriate parties as and when required, both during the life cycle of the project and as archived records against the relevant project and associated asset.

The use of the Livelink CPM Project Folder Structures (as described within UKBP/TP200 – Collaboration and Publication of Project Documents via the CPM Livelink System) is mandated for all projects included in the Capital Plan and their Workbooks, as described within UKBP/TP146 – Investment Process.

Livelink is designed to facilitate:

• Organisation of documents and other work items in a central, secure and permissioncontrolled environment.

  • Sharing, locating, and managing project specific information during the life-cycle of the project and archiving of final records and documentation.

• Revision of documents and other information in a version-controlled and auditable environment.

• Continuous Improvement and sharing of Best Practice between National Grid, its Delivery Vehicles and supplier staff.

Management of business processes by creation and use of customised Workflows


Edition : 3
File Size : 1 file , 73 KB
Number of Pages : 13
Published : 07/01/2013

History


Related products

NG TS 3.08.07
Published Date: 01/01/2001
National Grid Technical Specifications - Non Metallic Underground Optical Fibre Cable
$59.1
NG TS 3.09.04
Published Date: 09/01/1992
Technical Specifications (NGTS) - Metering Voltage Failure Alarm Relays (MVFAs)
$55.2
NG TS 3.10.13
Published Date: 07/01/2010
Technical Specifications - Generic Technical Specifications - for Civil, Structural and Building Engineering - Minor Electrical Works
$138
NG SCT 16.01
Published Date: 09/01/1998
Site Commissioning Tests - Tariff Metering Cubicle and External Wiring - Installation
$55.2

Best-Selling Products

NAGDM 105-1998
Published Date: 01/01/1998
American National Standard - Test Method for Thermal Transmittance and Air Infiltration of Garage Doors
$16.2
NAGDM 106-1988
Published Date: 01/01/1988
Proposed American National Standard - Official Color Codes for Torsion and Extension Springs
$16.2