NG UKBP/TP 234 PDF

NG UKBP/TP 234 PDF

Name:
NG UKBP/TP 234 PDF

Published Date:
07/01/2015

Status:
[ Active ]

Description:

UK Business Procedure/Transmission Procedures - Management of Impressied Voltages and Methods of Control

Publisher:
National Grid

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
ng-ukbp-tp-234_2830399

Choose Document Language:
55.20 €
Need Help?

PURPOSE AND SCOPE

The purpose of this document is to give guidance to National Grid and its Contractors on the sources of Impressed Voltage, giving guidance on the means by which the hazards emanating from impressed voltage can be controlled.

The tables located in sections 1, 2, & 3 in the main body of the document identify the areas where Impressed Voltages are likely to occur, what the source of the Impressed Voltage is likely to be, the area of concern, proposed method of control and the associated reference documents. It is not by any means a full and exhaustive list and should be considered as instructive advice when considering carrying out work on HV equipment.

The procedure shall apply to all Electricity Transmission works / projects that comprise both the capital plan and maintenance programmes and sets out what needs to be considered throughout both the scheme development process through TP 500 for Capital Projects and for National Grid Maintenance under PS (T) EPS 11.0, Maintenance Policy to help develop and maintain a safe system of work.

The document itself does not constitute a safe system of work but does give guidance on known situations of where Impressed Voltages can occur and actions to be applied for their control


Edition : 1
File Size : 1 file , 360 KB
Number of Pages : 16
Published : 07/01/2015

History


Related products

NG TS 2.10.14
Published Date: 07/01/2018
Technical Specifications - Generic Electricity Substation Design Manual for Civil, Structural and Building Engineering Section No: 14 Technical Security Specifications for Integrated Security Solution Sites
241.50 €
NG TS 3.05.15
Published Date: 05/01/2012
Technical Specifications - Mass Impregnated Cable for HVDC Voltages Up To 800KV
147.30 €
NG TGN(E) 194
Published Date: 04/01/2010
Technical Guidance Notes - Classification of Risk of Unauthorised Access to Overhead Line Towers
55.20 €
NG DH 12
Published Date: 07/01/2011
Design Handbook - Guidance on Grid Code Compliance Process for Design Assurance Engineers & Relay Settings Engineers
55.20 €

Best-Selling Products

HI/HYDRON 001
Published Date:
I=B=R Guide-Residential Hydronic Heating Installation/Design
HI/HYDRON 003
Published Date: 01/01/1993
S-40 Snow Melting Calculation and Installation
HI/HYDRON 004
Published Date: 01/01/1995
Radiant Floor Heating
HI/HYDRON 005
Published Date: 01/01/2008
I=B=R Ratings for Boilers, Baseboard Radiation, Finned Tube (Commercial) and Indirect-Fired Water Heaters
HI/HYDRON 006
Published Date: 01/01/2007
BTS-2000-Testing Standard for Commercial Space Heating Boilers
HI/HYDRON 007
Published Date: 01/01/2008
I=B=R Rating Procedure for Residential and Commercial Boilers