Building Envelope Commissioning (Glass Technical Paper ED 03-0717) PDF

Building Envelope Commissioning  (Glass Technical Paper ED 03-0717) PDF

Name:
Building Envelope Commissioning (Glass Technical Paper ED 03-0717) PDF

Published Date:
2017

Status:
Active

Description:

Publisher:
National Glass Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
building-envelope-commissioning-glass-technical-paper-ed-03-0717_1987069

Choose Document Language:
1.50
Need Help?
The purpose of this GIB is to acquaint those associated with the glazing industry with the impact Building Envelope Commissioning (?BECx?) can and will have as commissioning is implemented in construction projects. BECx is a process intended to verify through standards and testing that the materials, components, and systems that make up the building envelope achieve the objectives and meet the performance requirements of the owner. This document was first published in July 2017.
File Size : 1 file , 66 KB
Note : This product is unavailable in Belarus, Russia
Number of Pages : 7
Published : 2017

History


Related products

NGA FB47-15 (2021)
Published Date: 11/01/2021
Considerations When Installing Interior-Mounted Back-Painted Glass
1.50 €

Best-Selling Products

JEDEC EIA 318-B
Published Date: 07/01/1996
MEASUREMENT OF REVERSE RECOVERY TIME FOR SEMICONDUCTOR SIGNAL DIODES
17.70 €
JEDEC EIA 323 (R2002)
Published Date: 03/01/1966
AIR-CONVECTION-COOLED, LIFE TEST ENVIRONMENT FOR LEAD-MOUNTED SEMICONDUCTOR DEVICES
15.30 €
JEDEC EIA 365 (R1984)
Published Date: 11/01/1969
PERFORMANCE TEST PROCEDURE FOR SOLAR CELLS AND CALIBRATION PROCEDURE FOR SOLAR CELL STANDARDS FOR SPACE VEHICLE SERVICE
17.70 €
JEDEC EIA 397-1
Published Date: 07/01/1980
ADDENDUM No. 1 TO EIA-397
31.80 €
JEDEC EIA 397
Published Date: 06/01/1972
RECOMMENDED STANDARD FOR THYRISTORS
68.40 €
JEDEC EIA 557B
Published Date: 02/01/2006
STATISTICAL PROCESS CONTROL SYSTEMS
22.20 €