Name:
NR BR 1651 PART 5 PDF
Published Date:
03/01/1991
Status:
[ Active ]
Publisher:
Network Rail
This specification covers the requirements for Train Operated Points Indicator using Fibre Optic Light guides.
The Indicator Unit is required to display either a red rectangular indication or a yellow circular indication.
Each indication to be illuminated from its own designated lamp unit and individual transformer.
| File Size : | 1 file , 1.2 MB |
| Number of Pages : | 49 |
| Published : | 03/01/1991 |