Name:
NR NB 084 ISSUE 2 PDF
Published Date:
10/01/2009
Status:
[ Withdrawn ]
Publisher:
Network Rail
The information published in this Notice Board applies to all Mark Two Clamp Locks that are either in-service, waiting commissioning or in storage. Mark One Clamp Locks have a resilient rubber bush and are therefore not subject to this Notice Board.
Purpose
This Notice Board has been reissued following a continuing number of Clamp Lock failures caused by contamination build up inside the lock arm bush, therefore lubrication methods need to be clarified
| Edition : | 2 |
| File Size : | 1 file , 86 KB |
| Number of Pages : | 2 |
| Published : | 10/01/2009 |