Name:
NR NB 130 ISSUE 2 PDF
Published Date:
07/28/2017
Status:
[ Withdrawn ]
Publisher:
Network Rail
This Notice Board applies to anyone specifying level crossing renewals and designing level crossing SPAD mitigation. The scope includes design of SPAD mitigation for a signal protecting a level crossing. The diagram shows this as the distance “A”.
| Edition : | 2 |
| File Size : | 1 file , 180 KB |
| Number of Pages : | 5 |
| Published : | 07/28/2017 |