Name:
NR NB 133 ISSUE 2 PDF
Published Date:
02/10/2018
Status:
[ Withdrawn ]
Publisher:
Network Rail
The guidance applies to all Route Asset Managers (Signalling) and Project Engineering Managers responsible for undertaking works that will change or create new VSCS signalling map displays
Purpose
The purpose of this notice board is to highlight the issues and the steps that can be taken in the design of screen maps on VDU-based Signalling Control Systems (VSCS) to avoid or reduce operational risks for AHBC type level crossings.
| Edition : | 2 |
| File Size : | 1 file , 230 KB |
| Number of Pages : | 5 |
| Published : | 02/10/2018 |