Name:
NR NB 168 ISSUE 1 PDF
Published Date:
12/18/2018
Status:
[ Withdrawn ]
Publisher:
Network Rail
RCPL and IBCL Point Operating Equipment.
Purpose
To remind staff of the importance of carrying out a full lock and detection test when adjustments are made to detection on RCPL and IBCL Point operating equipment.
| Edition : | 1 |
| File Size : | 1 file , 150 KB |
| Number of Pages : | 1 |
| Published : | 12/18/2018 |