NR NB 176 ISSUE 1 PDF

NR NB 176 ISSUE 1 PDF

Name:
NR NB 176 ISSUE 1 PDF

Published Date:
11/18/2019

Status:
[ Withdrawn ]

Description:

SPX BR985 - Prevention of Overfilling and Contamination

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$5.7
Need Help?
PDF ONLY

This Notice Board clarifies the correct procedures to follow when checking and topping up the oil. It also advises on precautions to take when the Barrier Pack is stored and transported.

It is applicable to all staff who are installing and/or carrying out maintenance work on BR843 Barrier Machines and/or BR985 Hydraulic Barrier Packs.

Purpose

This Notice Board is aimed at preventing failure modes associated with the overfilling and contamination of hydraulic oil within the SPX BR985 Hydraulic Barrier Pack.


Edition : 1
File Size : 1 file , 360 KB
Number of Pages : 3
Published : 11/18/2019

History


Related products

NR NR/L2/RMVP/0200/P508 ISSUE 4
Published Date: 06/04/2022
Infrastructure Plant Manual: Mobile Elevating Work Platforms (MEWPs)
$7.5
NR T28054 ISSUE 2
Published Date: 06/20/2009
Lineside & on Track Equipment Typical Circuits Signals & Indicators - Banner Repeater Fibre Optic Type: Splitting: Control & Proving: (Locally Direct Fed)
$5.7
NR NR/L2/TRK/2102 ISSUE 12
Published Date: 06/03/2023
Design and Construction of Track
$35.4
NR NB 009 ISSUE 1
Published Date: 10/01/2003
Double Wound Relays
$5.7

Best-Selling Products

12051 CSMSB
Published Date: 01/01/2007
Chemical Safety Manual for Small Businesses
12051 ETHWM II
Published Date: 03/01/1998
Emerging Technologies in Hazardous Waste Management II
12051 FPI II
Published Date: 04/01/1998
Food and Packaging Interactions II
12051 GLPS
Published Date: 03/01/1998
Good Laboratory Practice Standards
12051 GRSD
Published Date: 11/01/1998
Groundwater Residue Sampling Design