NR NB 194 ISSUE 1 PDF

NR NB 194 ISSUE 1 PDF

Name:
NR NB 194 ISSUE 1 PDF

Published Date:
10/12/2020

Status:
[ Withdrawn ]

Description:

Track Circuit Showing Clear When Occupied

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This notice board applies to all staff involved in the management and testing of Wrong Side Failures associated with track circuits, including Route Control staff who deal with failure reports and those involved in the SINCs process.

Purpose

The purpose of this notice board is to provide a consistent and clear approach to management and testing of Track Circuit Wrong Side Failures, Remote Condition Monitoring (RCM) alarms and alerts associated with rail head contamination.

 

 

 


Edition : 1
File Size : 1 file , 280 KB
Number of Pages : 10
Published : 10/12/2020

History


Related products

NR X04220 ISSUE 2
Published Date: 02/06/1999
AHBC Typical Circuits Signal Control Circuits Double Line Bi-Directional with Signal Regulation, Stop/Non-Stop Controls and Over-Run Call by Treadle and Track Circuit
$5.7
NR BRS-SM 452/4
Published Date:
4" Centres Ground Frame Knuckle
$5.7
NR BRS-SM 452/3
Published Date:
4" Centres Ground Frame Catch Handle
$5.7
NR NR/CIV/SD/2077 ISSUE B
Published Date: 04/27/2012
Conarch Overbridge: General Arrangement 7.4m Parapet Beam Right Skew 45⁰
$5.7

Best-Selling Products