Name:
NR NB 202 ISSUE 2 PDF
Published Date:
01/25/2023
Status:
[ Active ]
Publisher:
Network Rail
This NB applies to all projects that require assessment of POE loading required for any signalling power supply feeder design (new or existing system alteration) in accordance with NR/L2/SIG/30050 excluding battery backed signalling supply.
Purpose
The purpose of this Notice Board is to clarify the power loading values can be used for different Point Operating Equipment (POE) when assessing loads on the signalling power supply system.
| Edition : | 2 |
| File Size : | 1 file , 260 KB |
| Number of Pages : | 4 |
| Published : | 01/25/2023 |