NR NB 213 ISSUE 1 PDF

NR NB 213 ISSUE 1 PDF

Name:
NR NB 213 ISSUE 1 PDF

Published Date:
11/04/2022

Status:
[ Active ]

Description:

Pandrol Vortok AWS Fitment to RFF

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This notice board covers all Pandrol Vortok AWS magnets, end cover and gap cover attachment fixings to their respective RFF attachment points (for 1-bay, 2-bay and 3-bay configurations).

Purpose 

This notice board describes the acceptable methods for attaching Pandrol Vortok AWS magnets to the Rapid Fit Frame (RFF) stringers, to mitigate the risk of the standard threaded holes failing before reaching the specified torque.


Edition : 1
File Size : 1 file , 610 KB
Number of Pages : 10
Published : 11/04/2022

History


Related products

NR T28318 ISSUE 1
Published Date: 04/01/2006
Lineside & On Track Equipment Typical Circuits Signals & Indicators Colour Light, Lighting Circuit, 3 Aspect SSI (Dorman LED) Y/YY/G
$5.7
NR NR/L2/SIG/30014/D120/TS11-01 ISSUE 5
Published Date: 09/07/2024
Signalling Works Testing: Control Tables and Principles Testing Work Test Specification
$7.5
NR NR/CIV/SD/2041 ISSUE B
Published Date: 04/27/2012
Conarch Overbridge: General Arrangement 7.4m External Unit Square Span
$5.7
NR SSI8500G ISSUE 12
Published Date: 09/05/2015
Design of SSI Schemes - Chapter G: Cabling and Connections
$18.6

Best-Selling Products