NR NR/CIV/SD/F003/800/ADD2 ISSUE B PDF

NR NR/CIV/SD/F003/800/ADD2 ISSUE B PDF

Name:
NR NR/CIV/SD/F003/800/ADD2 ISSUE B PDF

Published Date:
12/01/2018

Status:
[ Active ]

Description:

Temporary Metallic Bridge Repair and Strengthening F003 Addendum

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$35.4
Need Help?
PDF ONLY

INTRODUCTION TO STANDARD DESIGNS AND DETAILS

The development of the Standard Designs and Details (SDD) has been undertaken by Network Rail to improve safety, asset reliability and increase efficiency. Their development is linked to Network Rail’s overall business objectives, to improve reliability of the railways and reduce the funding requirements for on-going management and maintenance of the network. The basis of the SDD focuses on two main areas that derive from these issues:

• Ensuring that the design meets Network Rail’s requirements

• The design is as successful as the designs of previous railway engineers, who built and maintained bridges that have given good service for approaching 150 years.

The use of the SDDs is promoted from the highest level within Network Rail.

The SDDs for the metallic underbridge repair and strengthening have been submitted and approved by Network Rail at Form A stage only of the Network Rail approvals process.

The purpose of the metallic underbridge repair and strengthening SDD was not to develop actual designs but to provide best practice guidance and details that can be used as reference when undertaking bridge specific strengthening designs.

The designer will need to produce a scheme specific Form A for the site under consideration. This Form A will detail the site specific parameters and the SDDs that will be used.

Following Form A approval the designer will need to undertake the detailed design and produce a full suite of scheme specific drawings, including general arrangement drawings, detailed design drawings and scheme specific details based around the SDD, where appropriate.

A Category II or III check of the site specific detailed design drawings is required.


Edition : B
File Size : 1 file , 2.7 MB
Number of Pages : 105
Published : 12/01/2018

History


Related products

NR NR/L2/SIG/30014/D120/TS13-61 ISSUE 1
Published Date: 03/01/2012
Signalling Works Testing Handbook: Level Crossing CCTV
$7.5
NR NR/L3/ELP/27240/NR/DIST C12 ISSUE 3
Published Date: 03/01/2017
Secondary Injection Testing of PBO2 Relays Using the ORTS 100 Test Set
$5.7
NR NR/L3/ELP/27240/NR/DIST C01B ISSUE 4
Published Date: 12/05/2020
Documentation, Notices and Signage at Traction and HV Non-Traction Distribution Locations
$7.5
NR NR/L2/SIG/30014/D115/DT3-11 ISSUE 1
Published Date: 03/01/2011
Defined Function Test - Relay Circuitry Set To Work Test
$5.7

Best-Selling Products