NR NR/GN/CIV/100/09 ISSUE 1 PDF

NR NR/GN/CIV/100/09 ISSUE 1 PDF

Name:
NR NR/GN/CIV/100/09 ISSUE 1 PDF

Published Date:
03/04/2023

Status:
[ Active ]

Description:

Strategic Design Manual: Implementation Strategy for Medium to Small Stations

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$24.3
Need Help?
PDF ONLY

This document only sets out the steps required to engage local community and stakeholders impacted by the creation of a medium to small station, prior to construction of the station on site. 

Defining specific design deliverables such as materials, accessibility, sustainability, and security are beyond the scope of this document. However, such topics may be identified as important in the brief, thereby shaping how they are designed on a site to site basis, responding to place not a standardised approach.

This document is intended to be read in conjunction with other Network Rail guidance and includes references where relevant. 

Purpose 

This guidance should be the constant companion of all Project Sponsors and senior management, tasked with delivering medium and small stations. This document is intended as any easy aide-mémoire, to assure a methodical and effective approach to community engagement - to identify and create the best option. 

Each project can generate a complex network of contributors and stakeholders, and this handbook offers the means to identify, map, and track the growth of that community of interested parties. Engaging with the right bodies, at the right time, and in the right way, is the key to avoiding obstacles and delays in project delivery… and ultimately delivering stations that are far more than the sum of their parts


Edition : 1
File Size : 1 file , 5.8 MB
Number of Pages : 70
Published : 03/04/2023

History


Related products

NR RT/LS/G/00023 ISSUE 2
Published Date: 04/01/2004
Best Practicable Means: Control of Noise and Vibration from Construction Operations (aka NR/GN/ENV/00023)
$13.2
NR NR/L2/SIG/30099/010 ISSUE 1
Published Date: 06/01/2012
Mechanical Locking: Lever Frame Overhaul (not including Mechanical Locking) - 10 Year Periodic Activity
$5.7
NR NR/CIV/SD/1027 ISSUE C
Published Date: 09/02/2017
Box Girder Underbridge Wide Floor >20-30 Degrees Skew - Sheet 4 of 4
$5.7
NR NR/CIV/SD/FORMA/272 ISSUE 1
Published Date: 06/04/2016
Form A: Scaling
$13.2

Best-Selling Products

Q52-98 Lockout/Tagout Video
Published Date: 03/15/1998