NR NR/GN/CIV/300 ISSUE 4 PDF

NR NR/GN/CIV/300 ISSUE 4 PDF

Name:
NR NR/GN/CIV/300 ISSUE 4 PDF

Published Date:
12/03/2022

Status:
[ Revised ]

Description:

Compliance Design Manual

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

The 300 series of design modules covers accessibility, wayfinding, security and safety in station environments and other public buildings associated with the safe transit of passengers. They are principally aimed at sponsors, public authorities, third party developers, designers, engineers, project managers, and anyone involved in the design and delivery of stations.

This standard and the associated modules should be applied to all National Managed Stations. It is also advised that it is applied to all categories of UK stations.

Purpose

This standard provides advisory guidance which supports Network Rail’s broad objectives, goals, strategies and policy requirements for station design and planning. It references UK legislation and British Standards and provides a framework for design processes, assurance systems and specified controls that will encourage good design, assurance and control at all levels of station and infrastructure development.


Edition : 4
File Size : 1 file , 790 KB
Number of Pages : 10
Published : 12/03/2022

History

NR NR/GN/CIV/300 ISSUE 5
Published Date: 06/03/2023
Compliance Design Manual
$7.5
NR NR/GN/CIV/300 ISSUE 4
Published Date: 12/03/2022
Compliance Design Manual
$7.5
NR NR/GN/CIV/300 ISSUE 3
Published Date: 09/03/2022
Compliance Design Manual
$7.5
NR NR/GN/CIV/300 ISSUE 2
Published Date: 03/06/2021
Compliance Design Manual
$7.5
NR NR/GN/CIV/300 ISSUE 1
Published Date: 12/05/2020
Compliance Design Manual
$7.5

Related products

NR NR/CIV/SD/2118-4 ISSUE B
Published Date: 04/27/2012
Conarch Overbridge: Reinforcement Details 7.4m Internal Unit Setting Out Details - Skew 45°
$5.7
NR BRS-SM 3288 ISSUE A
Published Date: 04/10/2015
Machine Operated Point Layout with Tubular Stretcher Bars - NR56 GVS switches - Mechanical Supplementary Drive Mounted External to 4 Foot
$5.7
NR NR/CIV/SD/823 ISSUE B
Published Date: 09/02/2017
Metallic Structure Repairs: L-Frame Strengthening New Cross Girder Arrangement
$5.7
NR NR/CIV/SD/3016 ISSUE A
Published Date: 09/02/2017
Traditional Front Wall Platform: Sheet 7 of 10 Elevation on Platform Ramp
$5.7

Best-Selling Products