NR NR/GN/ELP/00003 ISSUE 2 PDF

NR NR/GN/ELP/00003 ISSUE 2 PDF

Name:
NR NR/GN/ELP/00003 ISSUE 2 PDF

Published Date:
04/01/2006

Status:
[ Inactive ]

Description:

AC Electrified Lines Management of Incidents Involving Damage to Overhead Line Equipment

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
nr-nr-gn-elp-00003-issue-2_2765197

Choose Document Language:
13.20 €
Need Help?
INACTIVE * PDF ONLY

The Guide applies to the restoration of 25 kV a.c. overhead line equipment:

a) On Network Rail controlled infrastructure and at the interfaces with infrastructure not controlled by Network Rail, for example, interfaces with Train Operating Company depots;

b) To the Maintainer.

Purpose

The requirements for managing accidents and incidents are set out in Railway Group Standard GO/RT3472 (and associated Guidance Note GO/GN3672). The Standard is wide ranging and deals with electrified and non-electrified lines.

This Guide is intended to assist Network Rail operations, maintenance and engineering staff when damaged overhead line equipment (OLE) has to be restored following an incident.

The Guide is to be read in conjunction with, and actions are to be taken in accordance with, the relevant Network Rail standards, in particular, NR/SP/ELP/29987 and GE/RT8000 Modules AC1, AC2 and AC3 and Module M5.

Incidents range in their severity, geographical extent and their effect on rail traffic and possibly on road and pedestrian traffic at level crossings and elsewhere.

The Guide is intended primarily for those cases where the severity of damage generally requires the presence of a Rail Incident Officer (RIO) on the site. Whilst the Guide is not written for the repair of minor damage which does not warrant the attendance of an RIO, or where repairs can be left to a more convenient time, the contents may be of general help in these situations.

Because of the widely varying circumstances surrounding incidents, the Guide cannot be exhaustive and actions will need to be adapted and supplemented to suit particular situations.

It is in everyone's interest to achieve the earliest safe restoration of overhead line equipment in order to reduce to a minimum train lost minutes, inconvenience to customers, and the reputation of the railway business as a whole.


Edition : 2
File Size : 1 file , 100 KB
Number of Pages : 13
Published : 04/01/2006

History

NR NR/GN/ELP/00003 ISSUE 2
Published Date: 04/01/2006
AC Electrified Lines Management of Incidents Involving Damage to Overhead Line Equipment
13.20 €
NR RT/E/G/00003 ISSUE 1
Published Date: 08/01/2000
A.C. Electrified Lines Management of Incidents Involving Damage to Overhead Line Equipment
13.20 €

Related products

NR T00013 ISSUE 11
Published Date: 12/01/2007
Lineside & On Track Equipment Typical Circuits Index (4)
5.70 €
NR T60187 ISSUE 2
Published Date: 10/07/2005
Lineside & on Track Equipment Typical Circuits Point Machine T72 Point Machine & J.B Type 1, L.H.S.N.C. (Position 1 Normal) ACC: Electronic Interface (DEV/ CDEV) or (DEP/ CDEP) Detection Circuit with 3 Supplementary Detectors
5.70 €
NR NR/L2/P3M/224/MOD01 ISSUE 3
Published Date: 06/01/2024
Project Acceleration in a Controlled Environment (PACE) - Manage Risk - Quantitative Risk Assessment (QRA)
18.60 €
NR BRS-ST 98/9
Published Date:
Plate, Cover Control Switch Lifting Barrier Auto MK II B
5.70 €

Best-Selling Products

BS ISO/PAS 12006-3:2001
Published Date: 01/09/2002
Building construction. Organization of information about construction works-Framework for object-oriented information exchange
92.96 €
BS ISO/PAS 17984:2001
Published Date: 08/15/2001
Machine-made textile floor coverings. Determination of dimensional changes after exposure to heat and/or water
57.15 €