NR NR/GN/MTC/089 ISSUE 1 PDF

NR NR/GN/MTC/089 ISSUE 1 PDF

Name:
NR NR/GN/MTC/089 ISSUE 1 PDF

Published Date:
09/05/2020

Status:
[ Withdrawn ]

Description:

Guidance for the Exchange of Asset Data and the Continuing Maintenance of Assets Undergoing Change

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This guidance note applies to all project works that either temporarily or permanently renew, replace, alter, decommission, remove existing assets or provide new assets on Network Rail infrastructure. This does not apply where the project work is to be undertaken by the Maintainer of those assets.

It also applies to those project works that have the capacity to affect assets that are adjacent to, but not the subject of, the project works.

It does not apply to the transfer of responsibilities on the expiry of a contract for maintenance.

Purpose

This guidance document provides support to the process for introducing new assets or affecting existing assets on Network Rail infrastructure through the development and implementation of NR/L2/MTC/089 asset management plan (AMP).


Edition : 1
File Size : 2 files , 640 KB
Number of Pages : 11
Published : 09/05/2020

History


Related products

NR X39911 ISSUE 2
Published Date: 03/07/2015
Automatic Open Crossings Locally Monitored+B (AOCL+B) - Barrier Location - Link Analysis
$5.7
NR NR/L3/NDS/307 ISSUE 1
Published Date: 03/03/2012
NDS Waste Management
$18.6
NR NR/L3/SIG/10661 ISSUE 26
Published Date: 06/01/2024
Signalling Maintenance Task Intervals
$18.6
NR X74920 ISSUE 1
Published Date: 03/03/2012
MCB-OC(RTL) TYPICAL CIRCUITS SIGNAL CONTROL CIRCUITS (2) UP LINE (ABSOLUTE BLOCK SIGNALLING)
$5.7

Best-Selling Products

Directory Test
Published Date: 06/15/2021