NR NR/GN/OHS/00155 ISSUE 1 PDF

NR NR/GN/OHS/00155 ISSUE 1 PDF

Name:
NR NR/GN/OHS/00155 ISSUE 1 PDF

Published Date:
04/06/2020

Status:
[ Withdrawn ]

Description:

Short-Term Changes in the Creation and Application of Safe Work Packs and Briefing Arrangements COVID-19 Contingency Plan (Guidance for Regions on NR/L2/OHS/019)

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
W/D * PDF ONLY

This Guidance Note provides advice on how the business will manage safe track access and the process set out in NR/L2/OHS/019 during the period when it might have reduced resource and system access due to the spread of Coronavirus.

It applies to all work activities carried out lineside or on or near the line up to a maximum of 16 weeks from the date of publication. At the end of this period this document will be withdrawn or reviewed and re-published.

This Guidance Note covers the management of:

 a) any work planned to be executed under NR/L2/OHS/019 including modules 1, 2, 3 and 4 of that standard;

 b) work planned to be executed under NR/L2/OPS/202 and NR/L3/OPS/303.

Purpose

This Guidance Note sets out the STE Chief Health and Safety Officer’s guidance for the production and briefing of Safe Works Packs, whilst minimising person to person communications and limiting the size of groups receiving briefings.


Edition : 1
File Size : 1 file , 110 KB
Number of Pages : 11
Published : 04/06/2020

History


Related products

NR BR 1682 ISSUE C
Published Date: 10/01/1990
Environmental Housing for a CCTV Camera with CCD Imager, for Level Crossing Surveillance
$13.2
NR BRS-SM 2252
Published Date: 11/12/1985
Rail Clamp Point Lock Cylinder Mounting Plate Assembly
$5.7
NR BRS-SM 595 ISSUE A
Published Date: 07/03/1981
Train Operated Points G.A. of Hydraulics Equipment at Willesden for Lightly Worked Lines
$5.7
NR NR/CIV/SD/1345 ISSUE E
Published Date: 03/01/2019
U-Type Underbridges: Bearings: Standard Bearing Details for 23m & 25m Spans
$5.7

Best-Selling Products

VDI/VDE/ATV 3552 - DRAFT
Published Date: 10/01/2006
Draft Document - Use of field bus systems in water supply plants