NR NR/GN/OPS/030 ISSUE 6 PDF

NR NR/GN/OPS/030 ISSUE 6 PDF

Name:
NR NR/GN/OPS/030 ISSUE 6 PDF

Published Date:
09/05/2009

Status:
[ Inactive ]

Description:

Risk Assessment of Timetable Change - Guidance (aka NR/L2/OPS/030)

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
INAC S/S BY NR/L2/OCS/031 * PDF ONLY

When a timetable change is proposed, the procedure specified in NR/L2/OPS/031 will be followed. This guidance note gives more detail on the issues to consider and the tools available to assist in assessing the risks related to timetable change.

Purpose

This guidance note has been produced to assist in the risk assessment process described in NR/L2/OPS/031 "Risk Assessment and Briefing of Timetable Change".


Edition : 6
File Size : 1 file , 320 KB
Number of Pages : 13
Published : 09/05/2009

History


Related products

NR X70070 ISSUE 4
Published Date: 04/07/2007
MCB Typical Circuits Signal / Barrier Interlocking Circuits for Double Line
$5.7
NR NR/L2/TRK/6100/MOD05 ISSUE 3
Published Date: 06/03/2023
The Installation and Maintenance of Stretcher Bars: Fixed Stretcher Bars
$18.6
NR NR/L2/SIG/11201/MOD B5 ISSUE 5
Published Date: 06/02/2018
Signalling Design Handbook: Circuits - Electromagnetic Compatibility of Electronic Equipment
$13.2

Best-Selling Products

ATP ATP-3.3.7.1
Published Date: 04/22/2014
UAS TACTICAL POCKET GUIDE
$7.2
High Pressure Boilers
Published Date: 06/01/2003
Stationary Engineering
Published Date: 11/01/1995
$24