This guidance note lists the drawings, including bowties, that are applicable to Off Track.
It is applicable to those who:
• those specify asset requirements;
• undertake construction work; or
• carry out maintenance on the asset.
The drawings capture and consistently present the layout for:
• drawings of boundary measures specifications;
• drainage standard details;
• access facility standard details;
• sketched profiles and measurements of clearance zones for vegetation management; and
• bowtie diagrams visually demonstrating threats, consequences and controls.
The drawings have been created with Computer Aided Design (CAD) using sketch block and title block templates.
Purpose:
This guidance note provides the index and version control for:
a) drainage and Off track standard drawings; and
b) drainage and Off track bowtie risk management diagrams.