NR NR/GN/SIG/02022 ISSUE 2 PDF

NR NR/GN/SIG/02022 ISSUE 2 PDF

Name:
NR NR/GN/SIG/02022 ISSUE 2 PDF

Published Date:
12/03/2005

Status:
[ Active ]

Description:

Requirements for TASS Infrastructure - System Description

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This document provides details of the TASS system developed by ALSTOM for use on Network Rail infrastructure. The document includes a description of the infrastructure part of the TASS system. In order to ensure that the functionality of the system and the operating requirements are understood it also includes a description of some of the elements of the trainborne part of the system.

Purpose

This Guidance Note describes the Tilt Authorisation And Speed Supervision (TASS) system developed to deliver the principal requirements of Railway Group Standards GE/RT8012 ‘Controlling The Speed Of Tilting Trains Through Curves' and GE/RT8019 ‘Tilting Trains: Controlling Tilt Systems To Maintain Clearances'. This Guidance Note covers the following aspects of the system:-

• The overall TASS concept and its role in the safe operation of tilting trains.

• The context in which TASS operates, its external interfaces and major subsystems.

• The top-level application tasks and rules which govern the use of TASS.

• The normal and degraded operation modes of TASS, and the transitions between them.

• The set of operational scenarios, in which TASS functions, and which will form the basis of acceptance of the delivered system.

• TASS performance measures, which will form the basis of acceptance of inservice performance of the system.

• The physical aspects of the system and relationships with other systems.


Edition : 2
File Size : 1 file , 340 KB
Number of Pages : 44
Published : 12/03/2005

History


Related products

NR T60242 ISSUE 2
Published Date: 10/07/2005
Lineside & on Track Equipment Typical Circuits Lockout - Patrolman Lockout Two Control Units. Acc: Relay Interface Location Case Circuit
$5.7
NR SF/CTM/303A ISSUE 1
Published Date: 06/05/2010
Trainer Approval – Performance Record and Feedback Form
$5.7
NR NR/L3/INI/P3M/120 ISSUE 1
Published Date: 09/02/2017
Governance for Railway Investment Projects (GRIP) - Starting a Project
$13.2
NR NR/L3/SIG/10661 ISSUE 26
Published Date: 06/01/2024
Signalling Maintenance Task Intervals
$18.6

Best-Selling Products

A Dictionary of Virology
Published Date: 12/01/1996
$15
Graphics Gems
Published Date: 05/01/1994
$17.7