NR NR/GN/TRK/8001 ISSUE 1 PDF

NR NR/GN/TRK/8001 ISSUE 1 PDF

Name:
NR NR/GN/TRK/8001 ISSUE 1 PDF

Published Date:
06/02/2018

Status:
[ Active ]

Description:

Index of Track Bowties

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This Network Rail document comprises a controlled list of Track bowties. Each bowtie is shown expanded at three different levels:

a) top event, threats and consequences only (‘level 1’);

b) as in (a) but expanded to show controls, including control type and accountable roles (‘level 2’); and

c) as in (b) but expanded again to show control documents (e.g. standards) mapped to controls (‘level 3’).

Bowties are used to:

a) visually demonstrate the level of control Network Rail has over a specified risk;

b) support the identification of improvements to existing controls to manage risk more effectively; and

c) support the identification of the standards and control documents required to support the control of risk.

Purpose

This document provides the index and version control to the Track Bowties, diagrams that are used to visualise how risks are managed.


Edition : 1
File Size : 1 file , 520 KB
Number of Pages : 12
Published : 06/02/2018

History


Related products

NR BRS-SM 837 ISSUE A
Published Date: 07/06/1995
Point Identification Plates
$5.7
NR NR/L3/CIV/140/171C ISSUE 2
Published Date: 06/06/2009
Model Clause 171C: Maintenance Coating Works
$5.7
NR T60079 ISSUE 2
Published Date: 10/07/2005
Lineside & on Track Equipment Typical Circuits Indicators - Junction Indicator (2 Positions) Acc: Electronic Interface (Pot/ Clam) Peripheral Loc. - Loc. Case Circuit
$5.7
NR NR/L2/MTC/PL0175 ISSUE 8
Published Date: 12/04/2021
Infrastructure Maintenance Planning Handbook
$13.2

Best-Selling Products