Name:
NR NR/GN/XNG/30048 ISSUE 1 PDF
Published Date:
09/07/2019
Status:
[ Active ]
Publisher:
Network Rail
This Network Rail document comprises a controlled list of Level Crossings bowties.
Bowties are used to:
a) visually demonstrate the level of control Network Rail has over a specified risk;
b) support the identification of improvements to existing controls to manage risk more effectively; and
c) support the identification of the standards and control documents required to support the control of risk.
Purpose
This document provides the index and version control to the Level Crossings Bowties. Bowties are diagrams that are used to visualise how risks are managed.
| Edition : | 1 |
| File Size : | 1 file , 430 KB |
| Number of Pages : | 10 |
| Published : | 09/07/2019 |